The US-95, WIR Bridge, Deep Creek Bridge project was constructed in 2022 by MA DeAtley Construction. There is 13,760 Sf of Welded Wire Wall with a max height of 36'. The walls were designed by Shannon and Wilson, owned by Idaho Transportation Dept. and located in Potlatch, ID.
The Santa Clara Divide, CA ERFO FS Angel 2023-1(1) 3N17 wall was built in 2025 to extend the wall constructed in 2020 that suffered an additional failure next to the existing wall. The additional portion of wall is 3680 SF, with a maximum height of 40' and ties into the existing wall. The wall extension was built by Stewart Engineering Inc., designed by Cesaretti Engineered Solutions, and owned by Federal Highway, Central Federal Lands.

Before Photo
The Russian River Campground Access Phase 2 project is a Welded Wire Wall constructed in 2024. The wall is 14,000 SF, 16' tall, and located in Cooper Landing, AK. The wall was built by Qayaq Construction, LLC, designed by Shannon and Wilson, and owned by FHWA Western Federal Lands.
The Terminal 106 Redevelopment project is a Welded Wire Wall constructed in 2023. The wall is 13,692 SF, 25' tall, and located in Seattle, WA. The wall was built by Walltek Construction and designed by Cesaretti Engineered Solutions.
The Coeur Rochester POA11 wall was built in 2023 by TIC. The wall is 17,744 SF, 90' tall and located in Lovelock, NV. The wall was Designed by Cesaretti Engineered Solutions, and owned by Coeur Rochester.
WALL GEOMETRY AND CONDITIONS FOLLOW:
• Welded Wire Wall (2 walls total, 1 angle point)
• Maximum Wall Design Height: 90’
• Maximum Mat Length of 63’ (achieved with overlap splicing)
• Loading:
Approach Slab Load = (DL) 450 psf (LL) 250 kips / 33.75’x42’load (CAT789D) distribution slab @ 16’from face of wall = 895 psf
Typical construction equipment surcharge loading: 250 psf.
• Seismic Coefficient = PGA = 0.218
• Design Life of 30 years – Commercial Galvanized Steel
• 17,744 SF
The Newberry Hill - Culvert project is a Welded Wire Wall constructed in 2024. The wall is 21' tall, 6128 SF, and located in Silverdale, WA. The wall was built by Seton Construction, owned by Kitsap County, Dept. of Public Works, and designed by Cesaretti Engineered Solutions.
The Middleton Wastewater Treatment Facility Improvements project was constructed in 2008 by Circle C Construction. The wall consists of 8000 SF of Welded Wire Wall, and 345 CY of ArtWeld Gabions. The wall was designed by American Geotechnics (now Shannon and Wilson), and owned by the City of Middleton.
The 101 Cooks Valley EFA Wall was an emergency repair for Caltrans in 2023. The wall is 14' tall, 1968 SF, and located near Cooks Valley, Humboldt County, CA. The wall was built by Granite Construction, Inc., designed by Cesaretti Engineered Solutions, and owned by Caltrans.
The Sterling Highway MP 45-60 Stage 1A project is a Welded Wire Wall constructed in 2023. The wall is 3164 SF, 18' tall, and located in Cooper Landing, AK. The wall was built by Scarsella Bros., Inc., designed by Shannon and Wilson, and owned by AKDOT.
The Gold Run Pass Mine project is a Welded Wire Wall that was constructed in 2023. The wall is 14' tall, 2176 SF, and located in Healy, AK. The wall was designed by Shannon & Wilson. It was constructed and is owned by Usibelli Coal Mine, Inc.