• Santa Clara Divide extension wall

Santa Clara Divide, CA ERFO FS Angel 2023-1(1) 3N17

The Santa Clara Divide, CA ERFO FS Angel 2023-1(1) 3N17 wall was built in 2025 to extend the wall constructed in 2020 that suffered an additional failure next to the existing wall.   The additional portion of wall is 3680 SF, with a maximum height of 40' and ties into the existing wall.  The wall extension was built by Stewart Engineering Inc., designed by Cesaretti Engineered Solutions, and owned by Federal Highway, Central Federal Lands. 

Before Photo

Wall Type:
Welded Wire Wall
Wire Type:
Galvanized
Owner Type:
Government
Wall Height:
Over 30'
Wall Size:
Under 5000 SF
34.360272, -118.385556