The SR 542 Anderson Creek Culvert project is a Eureka Reinforced Soil Wall constructed in 2016. The SR 542 Anderson Creek Culvert wall is located in Bellingham, Whatcom County, Washington. The max wall height is 50 feet, is 30,532 feet and the walls backfill is lightweight cellular concrete (see video below). The owner and wall designer of the project is Washington State Dept. of Transportation. The contractor for the wall was Granite Construction Company.

:
Eureka Reinforced Soil (E.R.S.) 2-Stage
:
Galvanized
:
Government
:
Over 30'
:
Over 5000 SF

The Russian River Campground Access Phase 2 project is a Welded Wire Wall constructed in 2024.  The wall is 14,000 SF, 16' tall, and located in Cooper Landing, AK.  The wall was built by Qayaq Construction, LLC, designed by Shannon and Wilson, and owned by FHWA Western Federal Lands.

:
Welded Wire Wall
:
Galvanized
:
Government
:
Under 30'
:
Over 5000 SF

The US-95 / US-12 Aht'wy Plaza Interchange project is a ERS wall constructed in 2024.  The wall is 24,592 SF, 27' tall, and located in Lewiston, ID.  The wall was built by Knife River, designed by Shannon and Wilson, and owned by ITD.

:
Eureka Reinforced Soil (E.R.S.) 2-Stage
:
Galvanized
:
Government
:
Under 30'
:
Over 5000 SF

The Newberry Hill - Culvert project is a Welded Wire Wall constructed in 2024.  The wall is 21' tall, 6128 SF, and located in Silverdale, WA.  The wall was built by Seton Construction, owned by Kitsap County, Dept. of Public Works, and designed by Cesaretti Engineered Solutions.

:
Welded Wire Wall
:
Galvanized
:
Government
:
Under 30'
:
Under 5000 SF

The Middleton Wastewater Treatment Facility Improvements project was constructed in 2008 by Circle C Construction. The wall consists of 8000 SF of Welded Wire Wall, and 345 CY of ArtWeld Gabions.  The wall was designed by American Geotechnics (now Shannon and Wilson), and owned by the City of Middleton.

:
ArtWeld Gabions
:
Non-Galvanzied
:
Government
:
Under 30'
:
Over 5000 SF

The I-84 Middleton Rd Overpass project is a ERS wall constructed in 2021.  The wall is 6040 SF, 20' tall, and located in Nampa, ID. The wall was constructed by Concrete Placing Co., Inc., designed by SHN, and owned by ITD.

:
Eureka Reinforced Soil (E.R.S.) 2-Stage
:
Galvanized
:
Government
:
Under 30'
:
Over 5000 SF

The Blue Water Bridge Spiralnail Repair project is a Spiralnail Wiretruss wall to repair a wire-faced MSE wall built out of tolerance.  The wall consists of 2544 SF of wiretruss, and 159 Spiralnails.  The project is located in Port Angeles, WA, and owned by the County of Clallam Public Works Dept.

:
Spiralnail
:
Non-Galvanzied
:
Government
:
Under 30'
:
Under 5000 SF

The 101 Cooks Valley EFA Wall was an emergency repair for Caltrans in 2023.  The wall is 14' tall, 1968 SF, and located near Cooks Valley, Humboldt County, CA.  The wall was built by Granite Construction, Inc., designed by Cesaretti Engineered Solutions, and owned by Caltrans.

:
Welded Wire Wall
:
Galvanized
:
Government
:
Under 30'
:
Under 5000 SF

The Sterling Highway MP 45-60 Stage 1A project is a Welded Wire Wall constructed in 2023.  The wall is 3164 SF, 18' tall, and located in Cooper Landing, AK.  The wall was built by Scarsella Bros., Inc., designed by Shannon and Wilson, and owned by AKDOT.

:
Welded Wire Wall
:
Galvanized
:
Government
:
Under 30'
:
Under 5000 SF