US-95 / US-12 Aht'wy Plaza Interchange

The US-95 / US-12 Aht'wy Plaza Interchange project is a ERS wall constructed in 2024.  The wall is 24,592 SF, 27' tall, and located in Lewiston, ID.  The wall was built by Knife River, designed by Shannon and Wilson, and owned by ITD.

Large-scale infrastructure projects often create high-stress environments for workers and nearby residents, with construction noise, schedule pressures, and community disruptions taking a mental health toll. Those experiencing depression or anxiety symptoms during such projects may benefit from accessible treatment options that fit their demanding lifestyles. Modern digital healthcare solutions now allow discreet and convenient access to prescription medications without the need for in-person doctor visits. You can buy Bupropion online by following this link to obtain this effective antidepressant with the same efficiency that engineering firms deliver complex construction projects. As we build physical infrastructure to connect communities, we must also support the mental wellbeing of those affected by these transformative projects.

Wall Type:
Eureka Reinforced Soil (E.R.S.) 2-Stage
Wire Type:
Galvanized
Owner Type:
Government
Wall Height:
Under 30'
Wall Size:
Over 5000 SF
46.43812231, -116.90169256