The Lannon Quarry Stationary Jaw Plant Crusher is a Welded Wire Wall that was constructed in 2016.  The Wall is located in Lannon, WI, and designed by CESaretti Engineered Solutions.

 

Wall Details:

  • Welded Wire Wall, two angle points
  • Maximum Wall Height of 34’
  • Maximum Mat Length of 24’
  • Live Traffic Surcharge - Loaded CAT 777 Loader on a 34’x21’ Distribution Slab – 505  psfDead Load – 2.0’ Thick Concrete Distribution Slab – 300 psf
  • 50-year design life – Hot Dip Galvanized steel
  • 5,672 SF

:
Welded Wire Wall
:
Galvanized
:
Mining
:
Over 30'
:
Over 5000 SF

The W. Broadway Slide Mitigation project is a Welded Wire Wall.  The project is located on Budge Drive, Jackson Wyoming.  The Welded Wire Wall is 15,000 sf, and 27 feet tall. The owner of the wall is the Town of Jackson, and the wall designer was Nelson Engineering.

[[{"fid":"3223","view_mode":"default","fields":{"format":"default","alignment":"center"},"type":"media","field_deltas":{"1":{"format":"default","alignment":"center"}},"link_text":null,"attributes":{"class":"media-element file-default media-wysiwyg-align-center","data-delta":"1"}}]]

Before photo of the slide

:
Welded Wire Wall
:
Galvanized
:
Government
:
Under 30'
:
Over 5000 SF

The Caltrans Mud Creek Rockfall Berms Hwy Project is a Welded Wire Wall.  The Project is Located on Highway 1 in Big Sur, CA, and was needed as a result of the 2017 Landslide in Big Sur. The Welded Wire Wall is 25,000 square feet.  The Owner is California Department of Transportation.  The wall designer for the project was Gresham Eckrich at Yeh and Associates, and the contractor was John Madonna Construction Co., Inc.

:
Welded Wire Wall
:
Galvanized
:
Government
:
Over 30'
:
Over 5000 SF

The Middle Fork Snoqualmie River Rd project is a Welded Wire Wall, and constructed in 2015. The Middle Fork Snoqualmie River Rd wall is located at Mt. Baker-Snoqualmie Natl Forest, ~5 Mi E of North Bend, King County, Washington. The wall height is 14 feet and 3328 square feet. The owner of the wall is FHWA – WFL. The wall design for the project was done by SHN Consulting Engineers & Geologists and the contractor was Active Construction, Inc.

:
Welded Wire Wall
:
Galvanized
:
Government
:
Under 30'
:
Under 5000 SF

The 700 Brotherhood Way project is ArtWeld Gabions constructed in 2014. The 700 Brotherhood Way gabions are located at 700 Brotherhood Way- Block 7331, lot 5, San Francisco, San Francisco County, California. The height of the wall is 4 feet and is 1119 cubic yards. The owner of the gabions is Comstock Homes. The wall designer for the project was BKF Engineers and KPFF Consulting Engineers and the contractor was Cowan & Thompson Construction, Inc.

:
ArtWeld Gabions
:
Galvanized
:
Private
:
Under 30'
:
Over 500 CY

The Entiatqua Trail Project is a ArtWeld Gabion wall constructed in 2014. The Entiatqua Trail gabions are located in Chelan County, Washington. The gabions are 1300 cubic yards. The owner of the gabions is Chelan County Power Utilities District. The wall designer for the project is Shannon & Wilson, Inc., and the contractor is Hurst Construction.

:
ArtWeld Gabions
:
Galvanized
:
Government
:
Under 30'
:
Over 500 CY

 

The Hood River Project is a Eureka Reinforced Soil wall constructed in 2012. The Hood River
wall is located at Columbia River Hwy, Hood River, OR, I-80 Exit 64. The wall height is 20 feet and 2,352 square feet. The owner of the wall is Oregon Department of Transportation. The wall designer for the project is SHN Consulting Engineers & AMP; Geologists and the contractor is MEI Group.

:
Eureka Reinforced Soil (E.R.S.) 2-Stage
:
Galvanized
:
Government
:
Under 30'
:
Under 5000 SF

The Walmart Store #2323-02 Project is a Gabion-faced M.S.E. wall constructed in 2012. The Walmart Store #2323-02 project is located 3497 Bethel Rd SE, Port Orchard, WA. The wall height is 15 ft and is 3,339 square feet. The owner of the wall is Walmart. The wall designer for the project was Terracon Consulting Engineers and Scientist and the contractor was Stan Palmer Construction.

:
Gabion-Faced M.S.E.
:
Galvanized
:
Private
:
Over 30'
:
Over 5000 SF

The Starkes Grade Road Slipout Project is Welded Wire Wall and was constructed in 2018. The Starkes Grade Road wall is located in Placerville, CA. The wall height is 25 feet and is 3104 square feet. The owner and the project wall designer was the County of El Dorado, Department of Transportation (DOT). The project contractor was Trinity River Construction, Inc.

:
Welded Wire Wall
:
Galvanized
:
Government
:
Under 30'
:
Under 5000 SF

The McCutcheon Road project is a Truss Spiralnail wall, and was constructed in 2017. The McCutcheon Road is located Bonney Lake, Pierce County, Washington. The height of the wall is 10 feet and 4260 square feet. The owner of the wall is Pierce County, Planning & Public Works. The projects wall designer was Golder Associates and the contractor was Omega Contractors, Inc.

:
Spiralnail
:
Galvanized
:
Government
:
Under 30'
:
Under 5000 SF