The SH 16 Over Phyllis Canal & Joplin Rd project is a ERS wall constructed in 2013. This ERS wall is 14,800 SF, 39' tall, and is located in Meridian, ID. The wall was constructed by Concrete Placing Company, it was designed by SHN Consulting Engineers & Geologists, and is owned by the Idaho Transportation Department.
The De Pere - Suamico, Memorial Dr-CTH M B5/129, Call #12 project is a ERS wall constructed in 2013. This ERS wall is 5,654 SF, 28' tall, and is located in Howard, WI. The wall was constructed by Vinton Construction Company, the panels were manufactured and set by Lunda Construction Company, and the wall is owned by WisDOT.
De Pere - Suamico, Morris Ave-Memorial Dr, Call# 16 project is a ERS wall constructed in 2012. This ERS wall is 32,792 SF, 20' tall, and is located in Howard, WI. The wall was constructed by Highway Landscapers, Inc., the panels were manufactured and set by Lunda Construction Company, and the wall is owned by WisDOT.
The De Pere - Suamico, Morris Ave-Memorial Dr., Call# 21 project is a ERS wall constructed in 2012-2014. This ERS wall is 164,216 SF, 38' tall, and is located in Howard, WI. The wall was constructed by Hoffman Construction Company, the panels were manufactured and set by Lunda Construction Company, and the wall is owned by WisDOT.
Click below for additional phases of this project:
The Rush Road to 13th Street project is a ERS wall constructed in 2008. The wall is 28' tall, 27,600 SF, and located in Chehalis, Washington. The Rush Road to 13th Street wall was built by Scarsella Bros. Inc., designed by SHN Consulting Engineers and Geologists, and owned by WSDOT.
The Center Street Bridge Project is a Welded Wire Wall constructed in 2008. The wall is 20' tall, 10,300 SF, and located in Clearfield Utah. The Center Street Bridge was constructed by Baker Construction, and owned by the City of Clearfield.
The CA ERFO Angeles NF 3N17(2) Santa Clara Divide project is a Welded Wire Wall Constructed in 2019/2020. This Welded Wire Wall is 38' tall, 5100 SF, and is located along the Santa Clara Divide Rd, Sylmar, CA 91342. The wall was constructed by Cutting Edge Constructors & Engineers, designed by Cesaretti Engineered Solutions, and is owned by Federal Highway, Central Federal Lands.
Before Photo
The Buriticá, Antioquia, Colombia Mine project was constructed in 2018. Construction supervision was provided by Tom Meehan, Earthtech West, LTD., and the walls were designed by Tom Jepsen, Jepsen Engineering.
Wall Details:
• Welded Wire Walls – Four locations:
Area 6100 WTP, Area 3100 Primary Crusher, Area 6511 Workshop and Area 6950 Loading Station
• Surcharge Conditions:
• ULL for crusher 1331 psf, all other areas 500 psf
• Seismic acceleration of 0.20g
• 50-year design life – Hot Dip Galvanized
• 45,136 TOTAL all 4 areas [18 ea. 40’ OT containers]
• Maximum Wall Height of 48’
• Maximum Mat Length of 34’
Miller Creek is a Spiralnail / Trinity Wall project was built in 2005, and located 14 Miles from Clatskanie, Oregon. This project consists of 5,574 SF of Trinity Wall, and 300 Spiralnails. The wall height is 35' with a maximum Spiralnail length of 24'. The Miller Creek project was constructed by Columbia Soil & Water Conservation District, is owned by the Lower Columbia River Water Council, and was Designed by Aziz Engineering Co.
The Purdy Creek Bridge Replacement is a Welded Wire Wall located in Mason County, Washington. The Wall was built by Quig Bros., Inc., it is 24,000 SF, and 22' tall. The Purdy Creek Bridge Replacement is owned by the Washington State Department of Transportation, and was designed by SHN Consulting Engineers and Geologists.