The S 228th Street UPRR Grade Separation Bridge & Roadway Phase 5 project is a Welded Wire Wall constructed in 2020 by Scarsella Bros., Inc. & AAA Contractors, Inc.  The wall is 24' tall, 16,165 SF and located in Kent, WA.  The wall was designed by SHN Consulting Engineers & Geologists, and owned by the City of Kent. 

:
Welded Wire Wall
:
Galvanized
:
Government
:
Under 30'
:
Over 5000 SF

The I-70 Glenwood Canyon Wall Improvements project was constructed in 2021 by Gould Construction.  The wall is 18' tall, 6,912 SF, and is located in Glenwood Springs, CO.  The wall was designed by RJ Engineering & Consulting, Inc, and owned by CDOT.

:
Welded Wire Wall
:
Galvanized
:
Government
:
Under 30'
:
Over 5000 SF

The City of Puyallup WSU Lid Frontage Improvements project is a Spiralnail Truss wall, and multiple gabion walls. The Spiralnail Truss wall is 3,156 SF of Truss, and 177 Spiralnails.  The gabion walls consist of 830 CY of ArtWeld Gabions.  The walls were constructed in 2021 by Reed Trucking and Excavating, Inc.  The Spiralnail Truss Wall was designed by Cesaretti Engineered Solutions, and all walls are owned by the City of Puyallup.

:
ArtWeld Gabions
:
Galvanized
:
Government
:
Under 30'
:
Under 5000 SF

The Ruth Zenia Road & Van Duzen Road project is a Welded Wire Wall with Spiralnail temporary shoring constructed in 2021.  The Welded Wire Wall is 4,944 SF, and 18' tall.  The Spiralnail temporary shoring consists of 66 5'x16' flat mats and 208 Spiralnails.  The wall was built by Hat Creek Construction & Materials, designed by Cesaretti Engineered Solutions, and owned by Federal Highway, Central Federal Lands.

:
Spiralnail
:
Galvanized
:
Government
:
Under 30'
:
Over 5000 SF

The Caltrans 01-0F6804 is a ArtWeld Gabion Project for a Caltrans Designed Gabion Face MSE Wall. The wall was built in 2021 by R Brown Construction Co., Inc. and located in Willow Creek, CA. The Caltrans 01-0F6804 wall is 5,346 SF (594 CY of ArtWeld Gabions), and 12' tall.  The wall was designed and is owned by Caltrans.

:
ArtWeld Gabions
:
Galvanized
:
Government
:
Under 30'
:
Over 5000 SF

The Waterfront Park Grant Street Pier project contains Gabion Faced MSE walls as well as ArtWeld Gabions for landscaping.  The primary Gabion Faced MSE wall is 4,126 SF, with a total amount of 5,597 SF (338 cubic yards) of ArtWeld Gabions.  The Wall was built in 2019 by Tapani Underground, Inc., designed by Cesaretti Engineered Solutions, and owned by the City of Vancouver.

:
ArtWeld Gabions
:
Galvanized
:
Government
:
Under 30'
:
Over 5000 SF

The Harrison Specialty Care Clinic Project consists of 104 CY of ArtWeld Gabion veneer, and 2,410 SF of ArtWeld Gabion MSE wall. These walls were constructed in 2020 by Active Construction Inc., and located in Silverdale, WA.  The walls were designed by NBBJ (veneer), and 2KS Consulting (MSE wall).

:
ArtWeld Gabions
:
Galvanized
:
Private
:
Under 30'
:
Over 5000 SF

The West Fork Cow Creek Culvert Replacement project is a Welded Wire Wall constructed in 2021.  The wall is 12' tall, 616 SF, and located in Coos County, OR.  The wall was constructed by Johnson Rock Products, designed by Cesaretti Engineered Solutions, and owned by the USDA Forest Service.

:
Welded Wire Wall
:
Galvanized
:
Government
:
Under 30'
:
Under 5000 SF

The Hammonton-Smartsville Road CA FLAP CR36(1) project. is a Welded Wire Wall that was constructed in 2016.  The wall is 22' tall, 1752 SF, and located near Yuba City, CA.  The wall was designed by Cesaretti Engineered Solutions, built by Lamon Construction Co., Inc., and owned by FHWA CFL and the County of Yuba.

: