ERFO NP YELL 2022-1 - Yellowstone

The ERFO NP YELL 2022-1 project is a Hilfiker Facing with Geogrid wall built in 2022, and located in Gardiner, MT.  The wall is 26' tall, 13,744 SF and built by Valley Fence, Inc.  Northwest linings facilitated the supply of the Hilfiker Facing materials, and provided the geogrid. The prime contractor is HK Contractors, and the wall is owned by Federal Highway Administration.

Energy Solutions Clive Facility - Railcar Dumping Building

The Energy Solutions Clive Facility - Railcar Dumping Building is a Hilfiker Facing with Geogrid wall built in 2022 and Located in Clive, UT.  The general contractor was Wollam Construction Company, the wall was built by Broken Arrow, Inc with technical assistance by EarthTech West II LTD.  The wall is 28' tall and 6,768 SF.  The wall was designed by American Geotechnics / Millcreek Engineering, and is owned by Energy Solutions, LLC.

Chinden Blvd & Curtis Rd.

The Chinden Blvd & Curtis Rd. project is a single stage panel wall constructed in 2021 by Compliance Solutions and Contracting.  The wall is 10' tall, 1223 SF, and located in Ada County, ID.  We also supplied materials for the temp shoring with our Spiralnails. The temp shoring consisted of 12 spiralnails and 3 5x16 W4 flat mats. The wall was designed by American Geotechnics, Inc., and owned by Ada County Highway District.

Pages