The I-70 Glenwood Canyon Wall Improvements project was constructed in 2021 by Gould Construction. The wall is 18' tall, 6,912 SF, and is located in Glenwood Springs, CO. The wall was designed by RJ Engineering & Consulting, Inc, and owned by CDOT.
Wall Type:
Welded Wire Wall
Wire Type:
Galvanized
Owner Type:
Government
Wall Height:
Wall Size:
Over 5000 SF