The De Pere - Suamico, Morris Ave-Memorial Dr., Call# 21 project is a ERS wall constructed in 2012-2014.  This ERS wall is 164,216 SF, 38' tall, and is located in Howard, WI. The wall was constructed by Hoffman Construction Company, the panels were manufactured and set by Lunda Construction Company, and the wall is owned by WisDOT.

Click below for additional phases of this project:

Call 16

Call 12

 

:
Eureka Reinforced Soil (E.R.S.) 2-Stage
:
Galvanized
:
Government
:
Over 30'
:
Over 5000 SF

The CA ERFO Angeles NF 3N17(2) Santa Clara Divide project is a Welded Wire Wall Constructed in 2019/2020.  This Welded Wire Wall is 38' tall, 5100 SF, and is located along the Santa Clara Divide Rd, Sylmar, CA 91342.  The wall was constructed by Cutting Edge Constructors & Engineers, designed by Cesaretti Engineered Solutions, and is owned by Federal Highway, Central Federal Lands.

 

Before Photo

 

:
Welded Wire Wall
:
Galvanized
:
Government
:
Over 30'
:
Over 5000 SF

The Buriticá, Antioquia, Colombia Mine project was constructed in 2018.  Construction supervision was provided by Tom Meehan, Earthtech West, LTD., and the walls were designed by Tom Jepsen, Jepsen Engineering.

 

Wall Details:

•    Welded Wire Walls – Four locations:  
      Area 6100 WTP, Area 3100 Primary Crusher, Area 6511 Workshop and Area 6950 Loading Station
•    Surcharge Conditions:
•    ULL for crusher 1331 psf, all other areas 500 psf
•    Seismic acceleration of 0.20g
•    50-year design life – Hot Dip Galvanized
•    45,136 TOTAL all 4 areas [18 ea. 40’ OT containers]         
•    Maximum Wall Height of 48’
•    Maximum Mat Length of 34’
 

:
Welded Wire Wall
:
Galvanized
:
Mining
:
Over 30'
:
Over 5000 SF

The South Field Crusher MSE Relocation wall is a welded wire wall constructed in November 1999. The project is located in in Gillette, Wyoming. The general contactor was TIC - The Industrial Company and the wall designer was Geotechnical Design Services Inc.

Wall Details:
        •  Design Loading: Komatsu 830E off-road, end dump trucks 
        •  7 year design life [non-galv.wire]    
        •  Maximum Wall height 40’
        •  Maximum Mat length of 27’ 
        •  4,832 SF  [designed as wingwalls, adjacent to crusher]
 

:
Welded Wire Wall
:
Non-Galvanzied
:
Mining
:
Over 30'
:
Under 5000 SF

The SR-114 Geneva Road is a Spiralnail project constructed in 2012 by the Slaton Bros.  This project consists of 20 hot dipped galvanized Spiralnails ranging from 16'-26' for supplemental load requirements for each concrete precast panel, range from 4-21.3 Kips.

After installation of an MSE precast wall system, a potential structural problem compromised the safety factor.  As a pre-emptive measure to restore the safety factor, Hilfiker supplied Spiralnails that were installed through the face of the panels to mitigate the problem and provide supplementary reinforcement. 

:
Spiralnail
:
Galvanized
:
Government
:
Over 30'
:
Under 5000 SF

Lot 121 Deer Crest-Pichinson Residence is a Welded Wire Wall / Spiralnail project. The Lot 121 Deer Crest-Pichinson Residence project was bulilt in 2008 and consists of 2200 SF of Welded Wire Wall, and 96 Spiralnails. 

This project was to add on to an existing wall that was installed about 10 years prior.  The 10 year old wall needed and additional 20' of Welded Wire Wall on top of the existing wall. The wall is now a tiered with a height of 46'.  For additional reinforcement, Spiralnails were installed in the existing wall to account for the load of the new wall on top.

:
Spiralnail
:
Non-Galvanzied
:
Private
:
Over 30'
:
Under 5000 SF

The West Slope Water District Reservoir project is a Spiralnail truss wall built in 2008, and located in Multnomah County, OR.  The wall consists of 3,680 SF of Spiralnail truss with a wall height of 44' and a max Spiralnail length of 24'.  The Wall was built by TBH & Associates, LLC, it was designed by Aziz Engineering Company, and is owned by the West Slope Water District.

:
Spiralnail
:
Galvanized
:
Government
:
Over 30'
:
Under 5000 SF

Miller Creek is a Spiralnail / Trinity Wall project was built in 2005, and located 14 Miles from Clatskanie, Oregon.  This project consists of 5,574 SF of Trinity Wall, and 300 Spiralnails.  The wall height is 35' with a maximum Spiralnail length of 24'.  The Miller Creek project was constructed by Columbia Soil & Water Conservation District, is owned by the Lower Columbia River Water Council, and was Designed by Aziz Engineering Co.

:
Spiralnail
:
Galvanized
:
Government
:
Over 30'
:
Over 5000 SF

The ERFO Road 1934 MP 2.1 project is a Welded Wire Wall located in the Willamette National Forest, Lane County, OR.  The wall was built by Weekly Bros., Inc. in 2014.  The wall is 7250 SF, and 40' Tall.  It is owned by the USDA Forest Service, Siuslaw National Forest, and was designed by the USDA Forest Service.

:
Welded Wire Wall
:
Galvanized
:
Government
:
Over 30'
:
Over 5000 SF

The Kings Corner Railroad Overpass project is a Welded Wire Wall located in Southeast Nampa, Idaho.  This Welded Wire Wall is 22,000 SF and 36' tall.  It was build in 2006 by Thueson Construction, it was designed by American Geotechnics, and owned by the City of Nampa.

:
Welded Wire Wall
:
Galvanized
:
Government
:
Over 30'
:
Over 5000 SF