The South Field Crusher MSE Relocation wall is a welded wire wall constructed in November 1999. The project is located in in Gillette, Wyoming. The general contactor was TIC - The Industrial Company and the wall designer was Geotechnical Design Services Inc.
Wall Details:
• Design Loading: Komatsu 830E off-road, end dump trucks
• 7 year design life [non-galv.wire]
• Maximum Wall height 40’
• Maximum Mat length of 27’
• 4,832 SF [designed as wingwalls, adjacent to crusher]
Wall Type:
Welded Wire Wall
Wire Type:
Non-Galvanzied
Owner Type:
Mining
Wall Height:
Wall Size:
Under 5000 SF