South Field Crusher MSE Relocation

The South Field Crusher MSE Relocation wall is a welded wire wall constructed in November 1999. The project is located in in Gillette, Wyoming. The general contactor was TIC - The Industrial Company and the wall designer was Geotechnical Design Services Inc.

Wall Details:
        •  Design Loading: Komatsu 830E off-road, end dump trucks 
        •  7 year design life [non-galv.wire]    
        •  Maximum Wall height 40’
        •  Maximum Mat length of 27’ 
        •  4,832 SF  [designed as wingwalls, adjacent to crusher]
 

Wall Type:
Welded Wire Wall
Wire Type:
Non-Galvanzied
Owner Type:
Mining
Wall Height:
Over 30'
Wall Size:
Under 5000 SF