The Coeur Rochester POA11 wall was built in 2023 by TIC.  The wall is 17,744 SF, 90' tall and located in Lovelock, NV.  The wall was Designed by Cesaretti Engineered Solutions, and owned by Coeur Rochester.

 

WALL GEOMETRY AND CONDITIONS FOLLOW:
•    Welded Wire Wall (2 walls total, 1 angle point)
•    Maximum Wall Design Height: 90’
•    Maximum Mat Length of 63’ (achieved with overlap splicing)
•    Loading:    
Approach Slab Load = (DL) 450 psf (LL) 250 kips / 33.75’x42’load (CAT789D) distribution slab @ 16’from face of wall = 895 psf
Typical construction equipment surcharge loading: 250 psf.
•    Seismic Coefficient = PGA = 0.218
•    Design Life of 30 years – Commercial Galvanized Steel
•    17,744 SF
 

:
Welded Wire Wall
:
Galvanized
:
Mining
:
Over 30'
:
Over 5000 SF

The Gold Run Pass Mine project is a Welded Wire Wall that was constructed in 2023.  The wall is 14' tall, 2176 SF, and located in Healy, AK. The wall was designed by Shannon & Wilson. It was constructed and is owned by Usibelli Coal Mine, Inc.

:
Welded Wire Wall
:
Galvanized
:
Mining
:
Under 30'
:
Under 5000 SF

The Dump Hopper and Feeder, Charles City project is a Welded Wire Wall constructed in 2022.  The wall is 1648 SF, 26' tall and located in Charles City, VA.  The wall was constructed by Bract Retaining Walls, designed by Cesaretti Engineered Solutions, and owned by Branscom, Inc.

:
Welded Wire Wall
:
Non-Galvanzied
:
Mining
:
Under 30'
:

The Crusher Relocation Wall 2020 was constructed by Kiewit, and designed by Bret Debernardi with Gordon Geotechnical Engineering, Inc.

 

WALL GEOMETRY AND CONDITIONS FOLLOW:
•    Welded Wire Walls (4 walls total, 4 angle points total)
•    Maximum Wall Height of 122’
•    Maximum Mat Length of 98’ 
•    Loads: 4,640 psf, CAT 797F (or Komatsu 930E) Mine Trucks, Crawler & Crusher Load: 5700 psf
•    Design Life of 20 years – Hot Dip Galvanized Steel
•    96,592 SF

Clip of the 4.7 million pound crusher being moved 

:
Welded Wire Wall
:
Galvanized
:
Mining
:
Over 30'
:
Over 5000 SF

La Colorado, Sonora, Mexico Mine was constructed in 2013.  The wall was designed by Jepsen Engineering, construction supervision was provided by Hilfiker Retaining Walls.

WALL DETAILS
•    Welded Wire Wall
•    Maximum Wall Height of 38’
•    Maximum Mat Length of 28’
•    Uniform live load surcharge of 500 psf
•    10-year design life – Black steel / non-galvanized
•    524.34 SM / 5642 SF of Welded Wire Wall
 

:
Welded Wire Wall
:
Non-Galvanzied
:
Mining
:
Over 30'
:
Over 5000 SF

The Dominican Republic Crusher Walls project was constructed in 2011.  The two walls were designed by Jepsen Engineering.  Site supervision was provided by Hilfiker Retaining Walls, and EarthTech West Ltd.

 WALL DETAILS:
•    Welded Wire Walls/Limestone and Ore Crushers
•    Maximum Wall Height of 84’
•    Maximum Mat Length of 60’
•    Loads: 250 ton crawler crane, Manitowoc 999 or similar
•    Uniform load surcharge of 760 psf for a CAT 789C Mine Haul Truck
•    Seismic acceleration of 0.46g
•    Ore Crusher founded on non-carbonaceous rock
•    26-year design life – hot-dipped steel [based on ACCELERATED corrosion rate]
•    50,995 SF (4,138 SM)

:
Welded Wire Wall
:
Galvanized
:
Mining
:
Over 30'
:
Over 5000 SF

The Buriticá, Antioquia, Colombia Mine project was constructed in 2018.  Construction supervision was provided by Tom Meehan, Earthtech West, LTD., and the walls were designed by Tom Jepsen, Jepsen Engineering.

 

Wall Details:

•    Welded Wire Walls – Four locations:  
      Area 6100 WTP, Area 3100 Primary Crusher, Area 6511 Workshop and Area 6950 Loading Station
•    Surcharge Conditions:
•    ULL for crusher 1331 psf, all other areas 500 psf
•    Seismic acceleration of 0.20g
•    50-year design life – Hot Dip Galvanized
•    45,136 TOTAL all 4 areas [18 ea. 40’ OT containers]         
•    Maximum Wall Height of 48’
•    Maximum Mat Length of 34’
 

:
Welded Wire Wall
:
Galvanized
:
Mining
:
Over 30'
:
Over 5000 SF

The South Field Crusher MSE Relocation wall is a welded wire wall constructed in November 1999. The project is located in in Gillette, Wyoming. The general contactor was TIC - The Industrial Company and the wall designer was Geotechnical Design Services Inc.

Wall Details:
        •  Design Loading: Komatsu 830E off-road, end dump trucks 
        •  7 year design life [non-galv.wire]    
        •  Maximum Wall height 40’
        •  Maximum Mat length of 27’ 
        •  4,832 SF  [designed as wingwalls, adjacent to crusher]
 

:
Welded Wire Wall
:
Non-Galvanzied
:
Mining
:
Over 30'
:
Under 5000 SF

PROJECT & MATERIALS SUMMARY:

•    Spiralnails, Non-Galvanized/Black Steel, 134 Each, 16’ – 42’ lengths
•    Spiralnails spaced at 3’ vertical and 4’-8’ horizontal

In 1994, a Hilfiker Welded Wire Wall (72’ tall, 8-year design life), designed by MacIntosh Engineering, was constructed at the site and utilized as a truck dump supporting 162 ton GVW trucks.  In 2001, an addition to the structure, also a Welded Wire Wall designed by MacIntosh Engineering, was constructed.

In 2011, a design analysis by Collins Engineers, Inc. determined that corrosion, as anticipated, would limit extending the future service life of the structure.  A Spiralnail system to extend the service life an additional 10 years, as required by the owner, was designed by Collins Engineers, supplied by Hilfiker, and construction by EarthTech West.  Construction also included placing a berm at the toe of the existing wall.
 

 

:
Spiralnail
:
Non-Galvanzied
:
Mining
:
Over 30'
:
Over 5000 SF

The Bear Run Mining Project is a hot dipped galvanized welded wire wall mining project constructed in September 2009. The project is located Dugger, Indiana. The wall builder was Baker Construction and the wall designer was Geotechnical Design Systems Inc.

Wall Details:

•    Welded Wire Wall
•    Maximum Wall Height of 46’
•    Maximum Mat Length of 30’
•    Loads: CAT 789 End Dumps
•    Nominal pseudo-static seismic coefficient of 0.10g
•    30-year design life – Hot Dip Galvanized [based on ACCELERATED corrosion rate]
•     9,680 SF (899 SM)
 

:
Welded Wire Wall
:
Galvanized
:
Mining
:
Over 30'
:
Over 5000 SF