The Guardrail Program 264th Street East CRP 5884 project is a Spiralnail Wiretruss Wall that was constructed in 2021 by Granite Construction Inc. & Omega Contractors inc. The wall is 12' tall and consists of 1776 SF of Wiretruss and 207 Spiralnails. The wall was designed by Cesaretti Engineered Solutions and is owned by the County of Pierce Planning & Public Works
The S 228th Street UPRR Grade Separation Bridge & Roadway Phase 5 project is a Welded Wire Wall constructed in 2020 by Scarsella Bros., Inc. & AAA Contractors, Inc. The wall is 24' tall, 16,165 SF and located in Kent, WA. The wall was designed by SHN Consulting Engineers & Geologists, and owned by the City of Kent.
The Sullivan's Crossing Bicycle and Pedestrian Bridge project is a Welded Wire Wall with LDCC backfill. The wall is 32' tall, 3,536 SF and located in Portland, OR. The wall was designed by Cesaretti Engineered Solutions, constructed by HP Civil Inc., and owned by the Portland Bureau of Transportation.
The I-70 Glenwood Canyon Wall Improvements project was constructed in 2021 by Gould Construction. The wall is 18' tall, 6,912 SF, and is located in Glenwood Springs, CO. The wall was designed by RJ Engineering & Consulting, Inc, and owned by CDOT.
The OR244: Slope Repair and Rockfall Mitigation Project is a Welded Wire Wall constructed in 2021. The Wall is 8' tall, 1,744 SF, and located in La Grande OR. The wall was built by JAL Construction, Inc., designed by Cesaretti Engineered Solutions, and owned by ODOT.
The City of Puyallup WSU Lid Frontage Improvements project is a Spiralnail Truss wall, and multiple gabion walls. The Spiralnail Truss wall is 3,156 SF of Truss, and 177 Spiralnails. The gabion walls consist of 830 CY of ArtWeld Gabions. The walls were constructed in 2021 by Reed Trucking and Excavating, Inc. The Spiralnail Truss Wall was designed by Cesaretti Engineered Solutions, and all walls are owned by the City of Puyallup.
The Ruth Zenia Road & Van Duzen Road project is a Welded Wire Wall with Spiralnail temporary shoring constructed in 2021. The Welded Wire Wall is 4,944 SF, and 18' tall. The Spiralnail temporary shoring consists of 66 5'x16' flat mats and 208 Spiralnails. The wall was built by Hat Creek Construction & Materials, designed by Cesaretti Engineered Solutions, and owned by Federal Highway, Central Federal Lands.
The SR 530 Trafton Creek and Schoolyard Creek Fish Passage project is a Welded Wire Wall constructed in 2020 by Kiewit Corporation. The wall is 6,416 SF, 50' tall, and located in Arlington, WA. The wall was designed by Pacific Affiliates, Inc., and owned by Washington State Department of Transportation.
The SR 167 / 70th Avenue E. Vicinity Bridge Replacement Project is a ERS wall constructed in 2020 by KLB Construction and Guy F. Atkinson Construction. The wall is 7,184 SF, 32' tall, and located in Fife, WA. The wall was designed by SHN Consulting Engineers & Geologists and owned by Washington State Department of Transportation.
The Caltrans 01-0F6804 is a ArtWeld Gabion Project for a Caltrans Designed Gabion Face MSE Wall. The wall was built in 2021 by R Brown Construction Co., Inc. and located in Willow Creek, CA. The Caltrans 01-0F6804 wall is 5,346 SF (594 CY of ArtWeld Gabions), and 12' tall. The wall was designed and is owned by Caltrans.