The Big I Landscaping Project consists of 1,357 CY of ArtWeld Gabions. The project is located in Albuquerque, NM, deisgned by Collins Engineers, Inc., constructed by Mountain West Golfscape, Inc., and owned by The City of Albuquerque.
The Pat Hurley Park project consists of 906 CY of ArtWeld Gabions. The project is located in Albuquerque, NM, was built by TLC Plumbing and Utility, and owned by the City of Albuquerque, Parks and Recreation.
The Ruidoso Middle School project consists of 616 CY of ArtWeld Gabions. The wall was constructed by Desert Utility and Paving, LLC, designed by Ontiveros & Associates, Inc., and owned by Ruidoso Municipal School District.
The Caltrans 01-0F1604 project is a Welded Wire Wall constructed in 2022. The wall is 5,856 SF, 22' tall, and located on HWY 36 by Carlotta, CA. The wall was constructed by GR Sundberg, designed by Cesaretti Engineered Solutions, and owned by Caltrans.
The SH 3, Goosehaven Rd. to Round Lake Rd. project is a Welded Wire Wall with geofoam backfill constructed in 2022. The wall is 10' tall, 135,392 SF and located in St. Maries, ID. The wall was constructed by Knife River Corporation, designed by American Geotechnics (now Shannon & Wilson) and owned by Idaho Trasportation Department.
The I-84 Ustick Rd. Overpass is a ERS wall constructed in 2021 / 2022 by Cannon Builders. The wall is 21,552 SF, 28' tall and located in Caldwell, ID. The wall was designed by American Geotechnics and is owned by Idaho Transportation Dept.
The ERFO NP YELL 2022-1 project is a Hilfiker Facing with Geogrid wall built in 2022, and located in Gardiner, MT. The wall is 26' tall, 13,744 SF and built by Valley Fence, Inc. Northwest linings facilitated the supply of the Hilfiker Facing materials, and provided the geogrid. The prime contractor is HK Contractors, and the wall is owned by Federal Highway Administration.
The Beartooth Highway Project is a Welded Wire Wall that is located in Cody, WY. The wall was constructed in 2021 / 2022 by Structures Inc., and Missouri River Contractors, LLC. The Welded Wire Wall is 34,480 SF, and 34' tall. The wall was designed by Kane Geotech, Inc., and is owned by Federal Highway, Central Federal Lands.
The Chinden Blvd & Curtis Rd. project is a single stage panel wall constructed in 2021 by Compliance Solutions and Contracting. The wall is 10' tall, 1223 SF, and located in Ada County, ID. We also supplied materials for the temp shoring with our Spiralnails. The temp shoring consisted of 12 spiralnails and 3 5x16 W4 flat mats. The wall was designed by American Geotechnics, Inc., and owned by Ada County Highway District.
The NE 238th Dr., NE Halsey St., NE Glisan St. project is a Welded Wire Wall constructed in 2021. The wall is 28' tall, 17,416 SF, and located in Wood Village, OR. The wall was built by Keywest Retaining Systems, designed by Cesaretti Engineered Solutions, and owned by the County of Multnomah. Below is a video clip during construction.