The Prairie Line Trail is an ArtWeld Gabion wall, and was constructed in 2016. The Prairie Line trail wall is located at Hood St, between Pacific Ave & S Dock St, Tacoma, Washington. The wall height is 12 feet and is 692 cubic yards. The wall is owned by the City of Tacoma. The project wall designer was Land Arch and the contractor was AAA Contractors, Inc.
The Shotgun Cove project is a Welded Wire Wall that was constructed in 2015. The wall is located on the Shotgun Cove Trailhead, near Anchorage, Alaska. The wall is 2240 SF, and 14' tall.The owner of the wall is the City of Whittier. The contractor was Contech Engineered Solutions, LLC, and was designed by Pacific Affiliates.
The Kosciusko Road & Bridge Reconstruction project is a Welded Wire Wall constructed in 2016. The Kosciusko Road & Bridge Reconstruction wall is located Kosciusko Island (89 air mi NW of Ketchikan & 61 mi W of Wrangell), Alaska. The wall height is 22 feet and is 1736 square feet. The owner of the wall is USDA FS. The wall designer for the project was Pacific Affiliates Inc., and the contractor was Rock-N-Road Construction, Inc.
The Whidbey Island Rd Shoulder Repair project is a spiralnail wall constructed in 2016. The Whidbey Island Rd Shoulder Repair wall is located in Island County, Washington. The wall height is 28 feet and is 9922 square feet combined (three locations). The owner of the wall is Island County. The wall designer for the project was Island County Public Works and GeoEngineers, the contractor was C. Johnson construction.
The NBU Comal Springs Conservation center project is an ArtWeld Gabion Wall and was constructed in 2015. The wall is located on Klingmann St, New Braunfels 78130, Texas. The wall is 587.6 Cubic Yards and 10 feet tall. The owner is New Braunfels Utilities (NBU), the wall designer was CESaretti Engineered Solutions, and the contractor was Cribley Enterprises, Inc.
The Bogard Road Extension East Phase II project is a Welded Wire Wall constructed in 2015. The Bogard Road Extension East Phase II wall is located in Matanuska-Susitna Borough, Alaska. The height of the wall is 16 feet and 2096 square feet. Matanuska-Susitna Borough is the owner of the wall. The wall designer for the project was Zipper Geo Associates, LLC and the contractor was Contech Engineered Solutions LLC.
The California Asbestos Mine project is a Welded Wire Wall constructed in 2017. The California Asbestos Mine Wall is located Calaveras County, California. The wall designer for the project was CESaretti Engineered Solutions and the contractor was FORD Construction Company, Inc.
Wall Detals:
• Welded Wire
• Maximum Wall Height of 36’
• Maximum Mat Length of 26.25’
• Loads: traffic surcharge - (Typical Traffic Load) 250psf, occasional small trucks.
• 100-year design life – Hot-Dipped Galvanized
• 18,672 SF (6 AWG)
The SH 55 Goose Cr Grade is a welded wire wall constructed in 2015. The SH 55 Goose Cr Grade wall is located in Adams County, Idaho. The wall is 15376 square feet. The owner of the wall is Idaho Transportation Department. The wall designer for the project was SHN Consulting Engineers & Geologists and the contractor was Knife River.
The Green Valley Road at Weber Creek Bridge is gabion faced MSE wall constructed in 2016. The Green Valley Road at Weber Creek Bridge wall is located 0.7 mi W of Placerville Drive, Placerville, El Dorado County, California. The wall height 3 feet and is 1541 cubic yards. The owner of the wall is the County of El Dorado. The wall designer for the project is the County of El Dorado and the contractor was Viking Construction Company, Inc.
The Garberville water Clarification Unit is a welded wire wall with spiralnails constructed in 2014. The Garberville Water Clarification Unit wall is located in Humboldt County, California. The wall is 1728 square feet with 169 spiralnails. The owner of the wall is the City of Garberville. The wall designer for the project was SHN Consulting Engineers & Geologists and the contractor was Wahlund Construction and GR Wilcox enterprise, Inc.