The Terminal 106 Redevelopment project is a Welded Wire Wall constructed in 2023. The wall is 13,692 SF, 25' tall, and located in Seattle, WA. The wall was built by Walltek Construction and designed by Cesaretti Engineered Solutions.
The Coeur Rochester POA11 wall was built in 2023 by TIC. The wall is 17,744 SF, 90' tall and located in Lovelock, NV. The wall was Designed by Cesaretti Engineered Solutions, and owned by Coeur Rochester.
WALL GEOMETRY AND CONDITIONS FOLLOW:
• Welded Wire Wall (2 walls total, 1 angle point)
• Maximum Wall Design Height: 90’
• Maximum Mat Length of 63’ (achieved with overlap splicing)
• Loading:
Approach Slab Load = (DL) 450 psf (LL) 250 kips / 33.75’x42’load (CAT789D) distribution slab @ 16’from face of wall = 895 psf
Typical construction equipment surcharge loading: 250 psf.
• Seismic Coefficient = PGA = 0.218
• Design Life of 30 years – Commercial Galvanized Steel
• 17,744 SF
The 101 Cooks Valley EFA Wall was an emergency repair for Caltrans in 2023. The wall is 14' tall, 1968 SF, and located near Cooks Valley, Humboldt County, CA. The wall was built by Granite Construction, Inc., designed by Cesaretti Engineered Solutions, and owned by Caltrans.
The Sterling Highway MP 45-60 Stage 1A project is a Welded Wire Wall constructed in 2023. The wall is 3164 SF, 18' tall, and located in Cooper Landing, AK. The wall was built by Scarsella Bros., Inc., designed by Shannon and Wilson, and owned by AKDOT.
The US 20 Safety Upgrades project is a Welded Wire Wall constructed in 2022 for the Oregon Dept. of Transportation. The wall is 24' tall, 19,904 SF and located in Benton County, OR. The wall was constructed by HP Civil, Inc., and designed by Cesaretti Engineered Solutions.
The Dump Hopper and Feeder, Charles City project is a Welded Wire Wall constructed in 2022. The wall is 1648 SF, 26' tall and located in Charles City, VA. The wall was constructed by Bract Retaining Walls, designed by Cesaretti Engineered Solutions, and owned by Branscom, Inc.
The Caltrans 01-0F1604 project is a Welded Wire Wall constructed in 2022. The wall is 5,856 SF, 22' tall, and located on HWY 36 by Carlotta, CA. The wall was constructed by GR Sundberg, designed by Cesaretti Engineered Solutions, and owned by Caltrans.
The NE 238th Dr., NE Halsey St., NE Glisan St. project is a Welded Wire Wall constructed in 2021. The wall is 28' tall, 17,416 SF, and located in Wood Village, OR. The wall was built by Keywest Retaining Systems, designed by Cesaretti Engineered Solutions, and owned by the County of Multnomah. Below is a video clip during construction.
The S.E. 97th Ave. Sunnybrook Road project is a Welded Wire Wall True MSE bridge abutment.constructed in 2001 by Elting, Inc. The Welded Wire Wall is 58' tall, 10,446 SF, and located in Clackamas County, OR. The wall was designed by SHN Consutlting Engineers & Geologists, and owned by ODOT.
The Crusher Relocation Wall 2020 was constructed by Kiewit, and designed by Bret Debernardi with Gordon Geotechnical Engineering, Inc.
WALL GEOMETRY AND CONDITIONS FOLLOW:
• Welded Wire Walls (4 walls total, 4 angle points total)
• Maximum Wall Height of 122’
• Maximum Mat Length of 98’
• Loads: 4,640 psf, CAT 797F (or Komatsu 930E) Mine Trucks, Crawler & Crusher Load: 5700 psf
• Design Life of 20 years – Hot Dip Galvanized Steel
• 96,592 SF
Clip of the 4.7 million pound crusher being moved