The 2411 Broadway Starbucks project is a Spiralnail Wiretruss wall constructed in 2024.  The wall is 450 SF with 30 nails, and is 8' tall. The wall was constructed by Kernen Construction and Pacfic Builders was the prime contractor.  The wall was designed by Cesaretti Engineered Solutions, and is owned by Milestone Associates.

:
Spiralnail
:
Non-Galvanzied
:
Private
:
Under 30'
:
Under 5000 SF

The Blue Water Bridge Spiralnail Repair project is a Spiralnail Wiretruss wall to repair a wire-faced MSE wall built out of tolerance.  The wall consists of 2544 SF of wiretruss, and 159 Spiralnails.  The project is located in Port Angeles, WA, and owned by the County of Clallam Public Works Dept.

:
Spiralnail
:
Non-Galvanzied
:
Government
:
Under 30'
:
Under 5000 SF

The 112th Street South project is a Spiralnail wall constructed in 2023.  The wall consists of 2328 SF of wire-truss and 122 Spiralnails.  The wall was constructed by KeyWest Retaining Systems, Inc., designed by Cesaretti Engineered Solutions / The County of Pierce, and owned by the County of Pierce.

:
Spiralnail
:
Galvanized
:
Government
:
Under 30'
:
Under 5000 SF

The Caltrans 01-0N0904 project is a Spiralnail Wire-truss wall built in 2023 and located on Hwy 299, Humboldt County, CA. The wall is 560 LF, 3558 SF of wire-truss, and 211 Spiralnails.  The wall was constructed by McCullough Construction Inc., designed by Cesaretti Engineered Solutions, and owned by Caltrans.

:
Spiralnail
:
Galvanized
:
Government
:
Under 30'
:
Under 5000 SF

The TriMet Portland Milwaukie Light Rail (PMLR) - East Segment is a Spiralnail and ERS wall constructed in 2013.  The project consists of 113 Spiralnails, 1208 SF of truss panel, and 1536 SF of ERS wall. A section of the wall (section a) consists of driving Spiralnails in an existing wall and attaching a cast in place face to the nails acting as a form anchor.  Another portion (section b) consists of nails into the existing wall with truss panel facing behind the cast in place face with a section of compacted backfill between the existing wall and the truss panel facing.  The last section (section c) is our standard ERS wall with cast in place facia.  The wall was built by Stacy & Witbeck, Inc., designed by Ontoveros & Associates, Inc., and owned by Portland Milwaukie Light Rail (PMLR).  

:
Eureka Reinforced Soil (E.R.S.) 2-Stage
:
Galvanized
:
Government
:
Under 30'
:
Under 5000 SF

The Chinden Blvd & Curtis Rd. project is a single stage panel wall constructed in 2021 by Compliance Solutions and Contracting.  The wall is 10' tall, 1223 SF, and located in Ada County, ID.  We also supplied materials for the temp shoring with our Spiralnails. The temp shoring consisted of 12 spiralnails and 3 5x16 W4 flat mats. The wall was designed by American Geotechnics, Inc., and owned by Ada County Highway District.

:
Reinforced Soil Embankment (RSE) Precast Panels
:
Galvanized
:
Government
:
Under 30'
:
Under 5000 SF

The Guardrail Program 264th Street East CRP 5884 project is a Spiralnail Wiretruss Wall that was constructed in 2021 by Granite Construction Inc. & Omega Contractors inc.  The wall is 12' tall and consists of 1776 SF of Wiretruss and 207 Spiralnails.  The wall was designed by Cesaretti Engineered Solutions and is owned by the County of Pierce Planning & Public Works
 

:
Spiralnail
:
Galvanized
:
Government
:
Under 30'
:
Under 5000 SF

The Simonds Road Property project is a Spiralnail wall constructed in 2020.  The wall consists of  147 Spiralnails, 147 Flat mats, and is approximately 9,900 SF.  The wall was built by KLB Construction, and designed by Cesaretti Engineered Solutions.

:
Spiralnail
:
Galvanized
:
Private
:
Over 30'
:
Over 5000 SF

The City of Puyallup WSU Lid Frontage Improvements project is a Spiralnail Truss wall, and multiple gabion walls. The Spiralnail Truss wall is 3,156 SF of Truss, and 177 Spiralnails.  The gabion walls consist of 830 CY of ArtWeld Gabions.  The walls were constructed in 2021 by Reed Trucking and Excavating, Inc.  The Spiralnail Truss Wall was designed by Cesaretti Engineered Solutions, and all walls are owned by the City of Puyallup.

:
ArtWeld Gabions
:
Galvanized
:
Government
:
Under 30'
:
Under 5000 SF

The Ruth Zenia Road & Van Duzen Road project is a Welded Wire Wall with Spiralnail temporary shoring constructed in 2021.  The Welded Wire Wall is 4,944 SF, and 18' tall.  The Spiralnail temporary shoring consists of 66 5'x16' flat mats and 208 Spiralnails.  The wall was built by Hat Creek Construction & Materials, designed by Cesaretti Engineered Solutions, and owned by Federal Highway, Central Federal Lands.

:
Spiralnail
:
Galvanized
:
Government
:
Under 30'
:
Over 5000 SF