The 112th Street South project is a Spiralnail wall constructed in 2023. The wall consists of 2328 SF of wire-truss and 122 Spiralnails. The wall was constructed by KeyWest Retaining Systems, Inc., designed by Cesaretti Engineered Solutions / The County of Pierce, and owned by the County of Pierce.
Wall Type:
Spiralnail
Wire Type:
Galvanized
Owner Type:
Government
Wall Height:
Wall Size:
Under 5000 SF