The SR 542 Anderson Creek Culvert project is a Eureka Reinforced Soil Wall constructed in 2016. The SR 542 Anderson Creek Culvert wall is located in Bellingham, Whatcom County, Washington. The max wall height is 50 feet, is 30,532 feet and the walls backfill is lightweight cellular concrete (see video below). The owner and wall designer of the project is Washington State Dept. of Transportation. The contractor for the wall was Granite Construction Company.

:
Eureka Reinforced Soil (E.R.S.) 2-Stage
:
Galvanized
:
Government
:
Over 30'
:
Over 5000 SF

The US-95 / US-12 Aht'wy Plaza Interchange project is a ERS wall constructed in 2024.  The wall is 24,592 SF, 27' tall, and located in Lewiston, ID.  The wall was built by Knife River, designed by Shannon and Wilson, and owned by ITD.

:
Eureka Reinforced Soil (E.R.S.) 2-Stage
:
Galvanized
:
Government
:
Under 30'
:
Over 5000 SF

The I-84 Middleton Rd Overpass project is a ERS wall constructed in 2021.  The wall is 6040 SF, 20' tall, and located in Nampa, ID. The wall was constructed by Concrete Placing Co., Inc., designed by SHN, and owned by ITD.

:
Eureka Reinforced Soil (E.R.S.) 2-Stage
:
Galvanized
:
Government
:
Under 30'
:
Over 5000 SF

The TriMet Portland Milwaukie Light Rail (PMLR) - East Segment is a Spiralnail and ERS wall constructed in 2013.  The project consists of 113 Spiralnails, 1208 SF of truss panel, and 1536 SF of ERS wall. A section of the wall (section a) consists of driving Spiralnails in an existing wall and attaching a cast in place face to the nails acting as a form anchor.  Another portion (section b) consists of nails into the existing wall with truss panel facing behind the cast in place face with a section of compacted backfill between the existing wall and the truss panel facing.  The last section (section c) is our standard ERS wall with cast in place facia.  The wall was built by Stacy & Witbeck, Inc., designed by Ontoveros & Associates, Inc., and owned by Portland Milwaukie Light Rail (PMLR).  

:
Eureka Reinforced Soil (E.R.S.) 2-Stage
:
Galvanized
:
Government
:
Under 30'
:
Under 5000 SF

The I-84 Ustick Rd. Overpass is a ERS wall constructed in 2021 / 2022 by Cannon Builders.  The wall is 21,552 SF, 28' tall and located in Caldwell, ID.  The wall was designed by American Geotechnics and is owned by Idaho Transportation Dept.  

:
Eureka Reinforced Soil (E.R.S.) 2-Stage
:
Galvanized
:
Government
:
Under 30'
:
Over 5000 SF

The SR 167 / 70th Avenue E. Vicinity Bridge Replacement Project is a ERS wall constructed in 2020 by KLB Construction and Guy F. Atkinson Construction.  The wall is 7,184 SF, 32' tall, and located in Fife, WA.  The wall was designed by SHN Consulting Engineers & Geologists and owned by Washington State Department of Transportation.
 

:
Eureka Reinforced Soil (E.R.S.) 2-Stage
:
Galvanized
:
Government
:
Over 30'
:
Over 5000 SF

The SH-55 Snake River Bridge Marsing project is an ERS two stage panel wall.  The wall is 9,296 SF, 20' tall, and constructed in 2019 by Wadsworth Brothers Construction Company.  The wall is located in Marsing, ID, and owned by the ID DOT.  It was designed by Brett DeBernardi, Gordon Geotechnical Engineering, Inc., and the panels were manufactured by Oldcastle Precast, Inc.

:
Eureka Reinforced Soil (E.R.S.) 2-Stage
:
Galvanized
:
Government
:
Under 30'
:
Over 5000 SF

The RiverBend Place Manpower project is a ERS wall constructed in 2007. This ERS wall is located in Milwaukee, WI, the wall is 6472 SF,  with a max height of 14'.  The Wall was built by C W Purpero, Inc., it was designed by Tom Jepsen, Jepsen Engineering, and is owned by Manpower.

:
Eureka Reinforced Soil (E.R.S.) 2-Stage
:
Galvanized
:
Private
:
Under 30'
:
Over 5000 SF

The SH 16 Over Phyllis Canal & Joplin Rd project is a ERS wall constructed in 2013. This ERS wall is 14,800 SF, 39' tall, and is located in Meridian, ID. The wall was constructed by Concrete Placing Company, it was designed by SHN Consulting Engineers & Geologists, and is owned by the Idaho Transportation Department.

:
Eureka Reinforced Soil (E.R.S.) 2-Stage
:
Galvanized
:
Government
:
Over 30'
:
Over 5000 SF

The De Pere - Suamico, Memorial Dr-CTH M B5/129, Call #12 project is a ERS wall constructed in 2013.  This ERS wall is 5,654 SF, 28' tall, and is located in Howard, WI. The wall was constructed by Vinton Construction Company, the panels were manufactured and set by Lunda Construction Company, and the wall is owned by WisDOT.

:
Eureka Reinforced Soil (E.R.S.) 2-Stage
:
Galvanized
:
Government
:
Under 30'
:
Over 5000 SF