The Copperstone Mine Wall in Quartzite, Arizona was constructed in September 2011. The wall construction was provided by Larry Finman with Finman & Associates,  inc. The wall was designed by : Kirk Cesaretti, P.E., Ontiveros & Associates.

Wall Details:

  • Welded Wire Wall (three angle points) and ArtWeld Gabions
  • Maximum Wall Height of 26’
  • Maximum Mat Length of 21’
  • Dead & Live (Traffic) Loading:Two dead loads have been applied to the top of the Wire wall. The concrete Slab is assumed to be 18” thick.  Contributing a 225 psf surcharge directly above the wall. The Gabion wall dead load is assumed to be a 810 psf strip (3’ wide) load directly above the face of the wall. The JD300D Haul Truck is specified loaded at 103.108 lbs.  This load has been evenly distributed upon the concrete dump slab across the footprint of the truck (20.25’x7.75’).  This live load is equivalent to 660 psf and has been applied to all areas beyond the Gabion barrier and directly above the wall at the dump site.
  • Maximum ground acceleration coefficient, A = 0.100
  • 30-year design life – black steel (non-galvanized)
  • 3808 SF of Welded Wire Wall and 76 CY of ArtWeld Gabions

:
ArtWeld Gabions
:
Non-Galvanzied
:
Mining
:
Under 30'
:
Under 5000 SF

Hot Wheels Base Terminal at Alpine Meadows is a Welded Wire Wall that was constructed in 2019.  The wall is 4,500 sf and also consists of 111 cy of ArtWeld Gabions at the top. The wall is located at the Alpine Meadows Treeline Cirque lift, and is owned by Squaw Valley / Alpine Meadows.

:
ArtWeld Gabions
:
Non-Galvanzied
:
Private
:
Under 30'
:
Under 5000 SF

The PSHIA Turf Removal & Landscape Design is an ArtWeld Gabion Project Constructed in 2018 by GKP General Contracting Inc.  The project is located at the Phoenix Sky Harbor Internation Airport and is owned by the City of Phoenix Aviation Deptartment. The PSHIA Turf Removal & Landscape Design consists of 2,023 CY of ArtWeld Gabions.

:
ArtWeld Gabions
:
Non-Galvanzied
:
Government
:
Under 30'
:
Over 500 CY

The Power House Excavation Arrowrock Dam Project consists of two Welded Wire Walls with ArtWeld Gabions.  The two Welded Wire Walls total 8,000 sf with a height of 28', one of the walls also consists of 45 cy of ArtWeld Gabions.  The walls were construced in 2009 by Mountain States Hydro LLC, and was designed by American Geo Technics.

:
ArtWeld Gabions
:
Non-Galvanzied
:
Government
:
Under 30'
:
Over 5000 SF

The smoky canyon mine project is a Welded Wire Wall and ArtWeld Gabion wall constructed in October 2013 located in Caribou National Forest, Idaho (approximately 20 miles from Afton, Wyoming). The wall designer is K. Jeffrey Nelson, P.E., SHN Consulting Engineers & Geologists.

Wall Details:

•    4 Welded Wire Walls & ArtWeld Gabions
•    North Wall/West with 3 angle points
•    North Wall/East with 2 angle points
•    South Wall/West with 2 angle points
•    South Wall/East with 1 angle point
•    Maximum Wall Height of 26’
•    Maximum Mat Length of 22.75’
•    50-year design life – Commercial Galvanized steel
•    13,728 SF Total of Welded Wire Wall
•    40 CY of ArtWeld Gabions, 9 Gauge, Class III Galvanized, 3”x3” Welded Wire Mesh

:
ArtWeld Gabions
:
Galvanized
:
Mining
:
Under 30'
:
Over 5000 SF

The Ely, Nevada mining project is a hot dipped galvanized Welded Wire Wall constructed in March 2018. The project is located on State Route 892, Ely, NV 89803. The wall designer is CESaretti Engineered Solutions.

WALL GEOMETRY AND CONDITIONS:
•    Welded Wire Wall (seven angle points)
•    Maximum Wall Height of 24’
•    Maximum Mat Length of 18’
•    Loads: 350 psf (5’ Wide, 1’ from the Face of Wall)
•    Maximum ground acceleration coefficient, A=0.310
•    50-year design life – Hot Dip Galvanized
•     25,104 SF (218 AWG)
 

:
ArtWeld Gabions
:
Galvanized
:
Mining
:
Under 30'
:
Over 5000 SF

The MSE Crusher Wall at Nevada Mine was constructed in 2013. The wall construction was provided by EarthTech West, Ltd, and the wall was designed by Collins Engineering.

Wall Details:

  • Welded Wire Wall for Crusher & ArtWeld Gabion Wall (on top of WWW Crusher Wall)
  • Maximum Wall Height of 114’
  • Maximum Mat (spliced) Length of 80’
  • Loads: uniform live load surcharge of 900 psf, for CAT 795 haul truck
  • Seismic acceleration of 0.185 g
  • 20-year design life – Hot Dip Galvanized steel
  • 31,352 SF of Welded Wire Wall & 140 CY of ArtWeld Gabions, 9 gauge, galvanized

:
ArtWeld Gabions
:
Galvanized
:
Mining
:
Over 30'
:
Over 5000 SF

The Northgate Link Extension Light Rail project is a Artweld Gabion-faced MSE wall with veneer Artweld Gabions in Seattle Washington.  The Northgate Link Extension Light Rail was constructed in 2018-2019 by KLB Construction Inc.  It consists of 6,250 CY of Artweld Gabion-faced MSE and 4,200 CY of veneer Artweld Gabions. The owner of the project is Sound Transit and was designed by CESaretti Engineered Solutions.

:
ArtWeld Gabions
:
Non-Galvanzied
:
Government
:
Under 30'
:
Over 500 CY

The Lakewood Dam Repair project is an ArtWeld Gabion wall.  The Lakewood Dam Repair project was constructed in 2019 by Sierra Mountain Construction Inc.  It Consists of 137 cy of Artweld Gabions and is owned by the Tuolumne Utilities District and was designed by Condor Earth Technologies, Inc.

:
ArtWeld Gabions
:
Galvanized
:
Government
:
Under 30'
:
Under 500 CY

The Quartz Hill Project is an ArtWeld Gabion Wall that was built in 2019.  The Quartz Hill wall is 18 feet tall and 1,230 cy of ArtWeld Gabions.  The Owner of the wall is the City of Redding and it was built by Eddie Axner Construction.

:
ArtWeld Gabions
:
Galvanized
:
Government
:
Under 30'
:
Over 500 CY