The NER Phase 1 Final Paving, Landscaping is a ArtWeld Gabion Project located at the Seattle-Tacoma International Airport. This project consists of 770 CY of ArtWeld Gabions, it was constructed in 2011 by Harbor Pacific Contractors, Inc., and owned by the Seattle-Tacoma International Airport.
The Scottsdale - Chaparral Water Treatment Plant is a ArtWeld Gabion Project constructed in 2006. This project consists of 1060 CY of ArtWeld Gabions, was built by Specialty Contractors of Arizona, and owned by the City of Scottsdale.
Timber Sky is an ArtWeld Gabion project located in Flagstaff AZ. This project consists of 125 CY of ArtWeld Gabions, and was constructed in 2019. This project is privately owned and was built by Warner's Landscape Company.
Grandview Overlook is a ArtWeld Gabion Project Located in Page, AZ. The project consists of 190 CY of ArtWeld Gabions constructed in 2020. The Grandview Overlook project was built by the Canyon Club of Page Foundation, and is owned by the City of Page / Canyon Club of Page Foundation.
The Colonel Nesmith Readiness Center is a Artweld Gabion / Trinity Wall constructed in 2012 and located in Polk County, Oregon. The project consists of 310 CY of Artweld Gabions, and 394 CY of Trinity Baskets. The project was constructed by KeyWest Retaining Systems, Inc., designed by SHN Consulting Engineers & Geologists, and owned by the Oregon Military Department.
The Station Public House is a ArtWeld Gabion project that was constructed in 2019. It consists of 25 cubic yards of ArtWeld Gabions for landscaping at The Station Public House in Auburn, CA.
The Columbus Land Port of Entry is a ArtWeld Gabion project constructed in 2019, and located in Columbus, NM. This project consists of 693 cy of non-galvanized ArtWeld Gabions. The Columbus Land Port of Entry project was constructed by Accent Landscape Contractor's, Inc., and is owned by the U.S. General Services Administration.
Photo Credit: Robert Reck, Richter Architects
The Municipal Service Complex is a ArtWeld Gabion wall constructed in 2013. The project is located at the Municipal Service Complex in Jersey City, NJ. The Wall consists of 564 CY or ArtWeld Gabions, it was constructed by Vollers Excavating & Construction, Inc., and is owned by the city of Jersey.
The Boulder Falls Slope Mitigation and Visitor Access Improvements project is an ArtWeld Gabion Wall. The Wall is 12 feet tall and 108 cubic yards. The wall was built by Harrison Western Construction Corporation, designed by SHN Consulting Engineers & Geologists, and is owned by The City of Boulder.
The Kemmerer Mining Project was located in Kemmerer, Wyoming constructed in May 2011. The wall contractor was by Wollam Construction Company, the wall builder was Circle C Construction and the wall designer was Geotechnical Design Systems, Inc.
Wall Details:
- Welded Wire Wall and ArtWeld Gabions (Safety Berm)
- Maximum Wall) Height of 54’
- Maximum Mat Length of 38.5’
- 30-year design life – Commercial Galvanized
- 15,504 SF of Welded Wire Wall and 56 CY of ArtWeld Gabions