Sterling Highway

The Sterling Highway project is a Welded Wire Wall that was constructed in 2018.  The wall is located in Sterling, AK, it is 10,300 square feet and 20 feet tall.  The Wall was built by Contech Engineered Solutions / Granite Construction, designed by Pacific Affiliates, and is owned by Alaska Department of Transportation. 

Georgetown Crossroads Development

The Georgetown Crossroads Development is a Spread Footing Abutment Welded Wire Wall that was constructed in 2017.  The wall is located in Seattle, WA, it is 22,000 square feet, and 23 feet tall. The wall was construced by Quigg Bros., Inc. designed by Cesaretti Engineered Solutions, and is owned by Georgetown Crossroads, LLC.

Spruce Railroad Seg A/B

The Spruce Railroad Seg A/B is a Welded Wire Wall located near Port Angeles, WA.  The Wall is 2,850 SF and 18' tall. It was constructed in 2019 by Bruch & Bruch Construction and was designed by Cesaretti Engineer Solutions.  The owner of the wall is the US Dept. of the Interior, Natl Park Service / FHWA.

I-84 Rockfall

I-84 Rockfall is a Eureka Reinforced Soil wall.  The wall was built in 2004 and is located in The Dalles, Oregon.  The wall is 18 feet tall and 4,720 sf, and was designed by SHN Consulting Engineers.

Port of the Dalles

Port of the Dalles project is a 30 foot tall, 47,488 sf Eureka Reinforced Soil wall.  It is located on the Columbia River Highway, Wasco County, Oregon.  The wall is owned by the Oregon DOT, it was built in 1997 by Mocon Corp. and was designed by SHN Consulting Engineers.

Smoky Canyon Mine

The smoky canyon mine project is a Welded Wire Wall and ArtWeld Gabion wall constructed in October 2013 located in Caribou National Forest, Idaho (approximately 20 miles from Afton, Wyoming). The wall designer is K. Jeffrey Nelson, P.E., SHN Consulting Engineers & Geologists.

Wall Details:

Pages