The Gold Bar Project is a hot dip galvanized Welded Wire Wall constructed in May 2018. The wall is located 15 miles from Eureka, Eureka County, Nevada. The designer of the wall was Jepsen Engineering.

WALL GEOMETRY:
•    Welded Wire Wall 
•    Maximum Wall Height of 26’
•    Maximum Mat Length of 20’
•    Seismic acceleration of 0.20g
•    20-year design life – Hot Dip Galvanized
•    2,688 SF
 

:
Welded Wire Wall
:
Galvanized
:
Mining
:
Under 30'
:
Under 5000 SF

The Sorting Facility Ramp project is a mining project constructed in June 2018. The project is located in Montana. The maximum wall height is 28 feet and 8,440 square feet. The designer of the wall was CESaretti Engineered Solutions.

:
Welded Wire Wall
:
Galvanized
:
Mining
:
Under 30'
:
Over 5000 SF

The Nye, Montana Mining Project was constructed in September 2018. The project is located in Nye, Montana. The wall designer was CESaretti Engineered Solutions. 

WALL DETAILS:
•    Welded Wire Wall (one angle point)
•    Maximum Wall Height of 18’
•    Maximum Mat Length of 14’
•    Loads: Factor bearing load – 3,500 psf.
•    Maximum ground acceleration coefficient, A=0.150
•    75-year design life – Black Steel
•     2,592 SF (57 AWG)
 

:
Welded Wire Wall
:
Galvanized
:
Mining
:
Under 30'
:
Under 5000 SF

The SH 145 San Miguel County Project is a Welded Wire Wall Constructed in 2019 in Telluride Co.  The SH 145 San Miguel County wall is owned by the Colorado Department of Transportation and was built by Telluride Gravel, Inc. The wall is 20' tall and 15,500 sf, and was designed by Yeh and Associates.

:
Welded Wire Wall
:
Galvanized
:
Government
:
Under 30'
:
Over 5000 SF

The Northgate Link Extension Light Rail project is a Artweld Gabion-faced MSE wall with veneer Artweld Gabions in Seattle Washington.  The Northgate Link Extension Light Rail was constructed in 2018-2019 by KLB Construction Inc.  It consists of 6,250 CY of Artweld Gabion-faced MSE and 4,200 CY of veneer Artweld Gabions. The owner of the project is Sound Transit and was designed by CESaretti Engineered Solutions.

:
ArtWeld Gabions
:
Non-Galvanzied
:
Government
:
Under 30'
:
Over 500 CY

The Lakewood Dam Repair project is an ArtWeld Gabion wall.  The Lakewood Dam Repair project was constructed in 2019 by Sierra Mountain Construction Inc.  It Consists of 137 cy of Artweld Gabions and is owned by the Tuolumne Utilities District and was designed by Condor Earth Technologies, Inc.

:
ArtWeld Gabions
:
Galvanized
:
Government
:
Under 30'
:
Under 500 CY

The Quartz Hill Project is an ArtWeld Gabion Wall that was built in 2019.  The Quartz Hill wall is 18 feet tall and 1,230 cy of ArtWeld Gabions.  The Owner of the wall is the City of Redding and it was built by Eddie Axner Construction.

:
ArtWeld Gabions
:
Galvanized
:
Government
:
Under 30'
:
Over 500 CY

The Highlander Accelerator, is a ArtWeld Gabion project constructed in 2016. The Highlander Accelerator consists of 360 cy of Artweld Gabions.  This is a privately owned project, and was constructed by Linhart Construction, Inc.

:
ArtWeld Gabions
:
Galvanized
:
Private
:
Under 30'
:
Under 500 CY

The 26th Street & Southeastern Ave. project is a temporary Welded Wire Wall Constructed in 2019.  This Welded Wire Wall is 28 feet tall and 9,000 sf. The owner of the wall is South Dakota Dept. of Transportation, it was designed by SHN Engineering, and constructed by Linhart Construction, Inc.

:
Welded Wire Wall
:
Galvanized
:
Government
:
Under 30'
:
Over 5000 SF

The Riverwalk 7 project is a ArtWeld Gabion job constructed in 2015.  The Riverwalk 7 project is located on Rosovelt Island, New York. It consists of 45 cubic yards of Artweld Gabions.  The Owner is The Hudson Companies Inc,. and the contractor was Tony Casale Inc.

:
ArtWeld Gabions
:
Non-Galvanzied
:
Private
:
Under 30'
:
Under 500 CY