Nye, Montana Mining Project

The Nye, Montana Mining Project was constructed in September 2018. The project is located in Nye, Montana. The wall designer was CESaretti Engineered Solutions. 

WALL DETAILS:
•    Welded Wire Wall (one angle point)
•    Maximum Wall Height of 18’
•    Maximum Mat Length of 14’
•    Loads: Factor bearing load – 3,500 psf.
•    Maximum ground acceleration coefficient, A=0.150
•    75-year design life – Black Steel
•     2,592 SF (57 AWG)
 

Wall Type:
Welded Wire Wall
Wire Type:
Galvanized
Owner Type:
Mining
Wall Height:
Under 30'
Wall Size:
Under 5000 SF
45.39645633, -109.8663095