The Terminal 106 Redevelopment project is a Welded Wire Wall constructed in 2023.  The wall is 13,692 SF, 25' tall, and located in Seattle, WA.  The wall was built by Walltek Construction and designed by Cesaretti Engineered Solutions.

:
Welded Wire Wall
:
Galvanized
:
Private
:
Under 30'
:
Over 5000 SF

The Panorama West Subdivision project consists of Steepened Slope and Welded Wire Wall.  The Steepened Slope is approximately 45,000 SF with a max height of 80'.  Also, there is approximately 6,600 SF of Welded Wire Wall.  The project is located in Bonney Lake, WA and was was built by Olson Bros. Excavating, Inc.

:
Steepened Slope
:
Galvanized
:
Private
:
Over 30'
:
Over 5000 SF

The Base to Base Gondola, KT-22 project is a Welded Wire Wall with ArtWeld Gabions on top, constructed in 2022. The Welded Wire Wall is 4,640 SF and 30' tall, it also consists of 330 CY of ArtWeld Gabions.  The wall was built by Sierra Nevada Construction, designed by NV5, and owned by Palisades Tahoe.

:
ArtWeld Gabions
:
Galvanized
:
Private
:
Over 30'
:
Under 5000 SF

The Energy Solutions Clive Facility - Railcar Dumping Building is a Hilfiker Facing with Geogrid wall built in 2022 and Located in Clive, UT.  The general contractor was Wollam Construction Company, the wall was built by Broken Arrow, Inc with technical assistance by EarthTech West II LTD.  The wall is 28' tall and 6,768 SF.  The wall was designed by American Geotechnics / Millcreek Engineering, and is owned by Energy Solutions, LLC.

:
Hilfiker Facing with Geogrid
:
Galvanized
:
Private
:
Under 30'
:
Over 5000 SF

The Valais Phase 9 Development project is a gabion wall constructed by Watts Enterprises in 2015.  The wall is 18' tall and consists of 737 cubic yards of ArtWeld Gabions. The wall was designed by IGES, and is privately owned. 

:
ArtWeld Gabions
:
Non-Galvanzied
:
Private
:
Under 30'
:
Under 5000 SF

The Simonds Road Property project is a Spiralnail wall constructed in 2020.  The wall consists of  147 Spiralnails, 147 Flat mats, and is approximately 9,900 SF.  The wall was built by KLB Construction, and designed by Cesaretti Engineered Solutions.

:
Spiralnail
:
Galvanized
:
Private
:
Over 30'
:
Over 5000 SF

The Harrison Specialty Care Clinic Project consists of 104 CY of ArtWeld Gabion veneer, and 2,410 SF of ArtWeld Gabion MSE wall. These walls were constructed in 2020 by Active Construction Inc., and located in Silverdale, WA.  The walls were designed by NBBJ (veneer), and 2KS Consulting (MSE wall).

:
ArtWeld Gabions
:
Galvanized
:
Private
:
Under 30'
:
Over 5000 SF

The Progress Ridge Townsquare project is a Welded Wire Wall that was constructed in 2010 by KeyWest Retaining Systems, Inc.  The wall is 22' tall, 8728 SF, and located in Beaverton, OR.  The wall was designed by SHN Consulting Engineers & Geologists, and owned by Gramor Development.

:
Welded Wire Wall
:
Galvanized
:
Private
:
Under 30'
:
Over 5000 SF

The Dowling Residence project is Spiralnail Wiretruss / Trinity Basket wall.  The Project is located in Travis County, TX, it consists of 1368 SF of Wire Truss, 100 Spiralnails, and 560 SF of Trinity Baskets.  The wall was built by J. Pinnelli Co., and designed by Ten Eyck Landscape Architects.

:
Spiralnail
:
Galvanized
:
Private
:
Under 30'
:
Under 5000 SF

The Galena Ridge Golf Community project is a Welded Wire Wall constructed in 2007.  The wall is 42' tall, 12,728 SF with 546 CY of ArtWeld Gabion on top, and is located at the Galena Ridge Golf Community in Kellog, ID.  The Galena Ridge Golf Community Welded Wire Wall was constructed by Knife River (Hap Taylor & Sons), designed by American Geotechnics Inc., and is owned by Silver Mountain Resort.

:
ArtWeld Gabions
:
Non-Galvanzied
:
Private
:
Over 30'
:
Over 5000 SF