The Energy Solutions Clive Facility - Railcar Dumping Building is a Hilfiker Facing with Geogrid wall built in 2022 and Located in Clive, UT. The general contractor was Wollam Construction Company, the wall was built by Broken Arrow, Inc with technical assistance by EarthTech West II LTD. The wall is 28' tall and 6,768 SF. The wall was designed by American Geotechnics / Millcreek Engineering, and is owned by Energy Solutions, LLC.
Wall Type:
Hilfiker Facing with Geogrid
Wire Type:
Galvanized
Owner Type:
Private
Wall Height:
Wall Size:
Over 5000 SF