The Spruce Railroad Seg A/B is a Welded Wire Wall located near Port Angeles, WA. The Wall is 2,850 SF and 18' tall. It was constructed in 2019 by Bruch & Bruch Construction and was designed by Cesaretti Engineer Solutions. The owner of the wall is the US Dept. of the Interior, Natl Park Service / FHWA.
The PSHIA Turf Removal & Landscape Design is an ArtWeld Gabion Project Constructed in 2018 by GKP General Contracting Inc. The project is located at the Phoenix Sky Harbor Internation Airport and is owned by the City of Phoenix Aviation Deptartment. The PSHIA Turf Removal & Landscape Design consists of 2,023 CY of ArtWeld Gabions.
I-84 Rockfall is a Eureka Reinforced Soil wall. The wall was built in 2004 and is located in The Dalles, Oregon. The wall is 18 feet tall and 4,720 sf, and was designed by SHN Consulting Engineers.
Port of the Dalles project is a 30 foot tall, 47,488 sf Eureka Reinforced Soil wall. It is located on the Columbia River Highway, Wasco County, Oregon. The wall is owned by the Oregon DOT, it was built in 1997 by Mocon Corp. and was designed by SHN Consulting Engineers.
The Power House Excavation Arrowrock Dam Project consists of two Welded Wire Walls with ArtWeld Gabions. The two Welded Wire Walls total 8,000 sf with a height of 28', one of the walls also consists of 45 cy of ArtWeld Gabions. The walls were construced in 2009 by Mountain States Hydro LLC, and was designed by American Geo Technics.
The SH 145 San Miguel County Project is a Welded Wire Wall Constructed in 2019 in Telluride Co. The SH 145 San Miguel County wall is owned by the Colorado Department of Transportation and was built by Telluride Gravel, Inc. The wall is 20' tall and 15,500 sf, and was designed by Yeh and Associates.
The Northgate Link Extension Light Rail project is a Artweld Gabion-faced MSE wall with veneer Artweld Gabions in Seattle Washington. The Northgate Link Extension Light Rail was constructed in 2018-2019 by KLB Construction Inc. It consists of 6,250 CY of Artweld Gabion-faced MSE and 4,200 CY of veneer Artweld Gabions. The owner of the project is Sound Transit and was designed by CESaretti Engineered Solutions.
The Lakewood Dam Repair project is an ArtWeld Gabion wall. The Lakewood Dam Repair project was constructed in 2019 by Sierra Mountain Construction Inc. It Consists of 137 cy of Artweld Gabions and is owned by the Tuolumne Utilities District and was designed by Condor Earth Technologies, Inc.
The Quartz Hill Project is an ArtWeld Gabion Wall that was built in 2019. The Quartz Hill wall is 18 feet tall and 1,230 cy of ArtWeld Gabions. The Owner of the wall is the City of Redding and it was built by Eddie Axner Construction.
The Mariposa Port of Entry Project is a Welded Wire Wall and ArtWeld Gabions. The Mariposa Port of Entry wall is 52 feet tall and 86,000 sf, and also consists of 500 cy of Artweld Gabions. The Wall is owned by the General Services Administration Public Building Service, it was designed by Geotechnical Design Systems, and was built by Advanced Paving and Construction.