The Middleton Wastewater Treatment Facility Improvements project was constructed in 2008 by Circle C Construction. The wall consists of 8000 SF of Welded Wire Wall, and 345 CY of ArtWeld Gabions. The wall was designed by American Geotechnics (now Shannon and Wilson), and owned by the City of Middleton.
The Blue Water Bridge Spiralnail Repair project is a Spiralnail Wiretruss wall to repair a wire-faced MSE wall built out of tolerance. The wall consists of 2544 SF of wiretruss, and 159 Spiralnails. The project is located in Port Angeles, WA, and owned by the County of Clallam Public Works Dept.
The Dump Hopper and Feeder, Charles City project is a Welded Wire Wall constructed in 2022. The wall is 1648 SF, 26' tall and located in Charles City, VA. The wall was constructed by Bract Retaining Walls, designed by Cesaretti Engineered Solutions, and owned by Branscom, Inc.
The Wold Trade Center Projects (WTC Ramp & WTC Package 4B) are Welded Wire Walls constructed for a foundation rebuild that consisted of a ramp and a temporary pad to support a crane and excavator. The max height of the walls is 34' and both total ~18,000 SF. The pad was designed for loads of 898 PSF and a Komatsu PC1250LC8 (272,000 LBS), the ramp was designed for a Liebherr LR 1200 (123,000 LBS). The ramp was built by Kiewit Eastern District, designed by Collins Engineering, and owned by the Port Authority of NY / NJ. The pad was built by Phoenix Construction, also designed by Collins Engineering, and also owned by the Port Authority of NY / NJ.
The Big I Landscaping Project consists of 1,357 CY of ArtWeld Gabions. The project is located in Albuquerque, NM, deisgned by Collins Engineers, Inc., constructed by Mountain West Golfscape, Inc., and owned by The City of Albuquerque.
The ERFO NP YELL 2022-1 project is a Hilfiker Facing with Geogrid wall built in 2022, and located in Gardiner, MT. The wall is 26' tall, 13,744 SF and built by Valley Fence, Inc. Northwest linings facilitated the supply of the Hilfiker Facing materials, and provided the geogrid. The prime contractor is HK Contractors, and the wall is owned by Federal Highway Administration.
The Valais Phase 9 Development project is a gabion wall constructed by Watts Enterprises in 2015. The wall is 18' tall and consists of 737 cubic yards of ArtWeld Gabions. The wall was designed by IGES, and is privately owned.
The South Transfer Station project is a Welded Wire Wall with a Trinity veneer. constructed in 2012 by KLB Construction, Inc. The Welded Wire Wall is 35,568 SF, 17' tall, with 718 CY of Trinity Baskets. The project was designed by SHN Consulting Engineers & Geologists, owned by the City of Seattle Public Utilities and located in Seattle WA.
La Colorado, Sonora, Mexico Mine was constructed in 2013. The wall was designed by Jepsen Engineering, construction supervision was provided by Hilfiker Retaining Walls.
WALL DETAILS
• Welded Wire Wall
• Maximum Wall Height of 38’
• Maximum Mat Length of 28’
• Uniform live load surcharge of 500 psf
• 10-year design life – Black steel / non-galvanized
• 524.34 SM / 5642 SF of Welded Wire Wall
The Galena Ridge Golf Community project is a Welded Wire Wall constructed in 2007. The wall is 42' tall, 12,728 SF with 546 CY of ArtWeld Gabion on top, and is located at the Galena Ridge Golf Community in Kellog, ID. The Galena Ridge Golf Community Welded Wire Wall was constructed by Knife River (Hap Taylor & Sons), designed by American Geotechnics Inc., and is owned by Silver Mountain Resort.