The De Pere - Suamico, Morris Ave-Memorial Dr., Call# 21 project is a ERS wall constructed in 2012-2014.  This ERS wall is 164,216 SF, 38' tall, and is located in Howard, WI. The wall was constructed by Hoffman Construction Company, the panels were manufactured and set by Lunda Construction Company, and the wall is owned by WisDOT.

Click below for additional phases of this project:

Call 16

Call 12

 

:
Eureka Reinforced Soil (E.R.S.) 2-Stage
:
Galvanized
:
Government
:
Over 30'
:
Over 5000 SF

The Rush Road to 13th Street project is a ERS wall constructed in 2008.  The wall is 28' tall, 27,600 SF, and located in Chehalis, Washington.  The Rush Road to 13th Street wall was built by Scarsella Bros. Inc., designed by SHN Consulting Engineers and Geologists, and owned by WSDOT.

:
Eureka Reinforced Soil (E.R.S.) 2-Stage
:
Galvanized
:
Government
:
Under 30'
:
Over 5000 SF

The Mercer Slough Environmental Education Center is a ArtWeld Gabion project constructed in 2008.  The project consists of 200 CY of ArtWeld Gabions,built by the Layfield Group, and owned by the City of Bellevue / Pacific Science Center.

:
ArtWeld Gabions
:
Galvanized
:
Private
:
Under 30'
:
Under 500 CY

The Center Street Bridge Project is a Welded Wire Wall constructed in 2008.  The wall is 20' tall, 10,300 SF, and located in Clearfield Utah.  The Center Street Bridge was constructed by Baker Construction, and owned by the City of Clearfield.

:
Welded Wire Wall
:
Galvanized
:
Government
:
Under 30'
:
Over 5000 SF

The 3 Road Bridge (172) project is a Welded Wire Wall Constructed in 2015. The two walls together are 4032 SF, a max height of 20', and located in Eatonville, Washington.  The 3 Road Bridge (172) project was constructed by Mike McClung Construction, designed by Cesaretti Engineered Solutions, and owned by Hancock Forest Management.

:
Welded Wire Wall
:
Galvanized
:
Private
:
Under 30'
:
Under 5000 SF

The UW Montlake Triangle & Lower Rainier Vista project is a Gabion-Faced MSE wall constructed in 2015.  The wall is 22' at the tallest point, 3800 SF and located in Seattle, Washington. The UW Montlake Triangle & Lower Rainier Vista project was constructed by KLB Construction Inc., Designed by Cesaretti Engineered Solutions, and owned by the University of Washington

:
Gabion-Faced M.S.E.
:
Galvanized
:
Government
:
Under 30'
:
Under 5000 SF

The CA ERFO Angeles NF 3N17(2) Santa Clara Divide project is a Welded Wire Wall Constructed in 2019/2020.  This Welded Wire Wall is 38' tall, 5100 SF, and is located along the Santa Clara Divide Rd, Sylmar, CA 91342.  The wall was constructed by Cutting Edge Constructors & Engineers, designed by Cesaretti Engineered Solutions, and is owned by Federal Highway, Central Federal Lands.

 

Before Photo

 

:
Welded Wire Wall
:
Galvanized
:
Government
:
Over 30'
:
Over 5000 SF

The Bluffs Park - Bonny Slope Trail Project is a Artweld Gabion wall constructed in 2019. The project is located in Portland, Oregon and consists of 179 Cubic Yards of gabions. The walls owner is Tualatin Parks & Recreation, the wall builder is 3 Kings Environmental, and the projects engineer is AKS Engineering & Foresty.

:
ArtWeld Gabions
:
Galvanized
:
Government
:
Under 30'
:
Under 500 CY

N. Vassault Street Sidewalk Improvements is a Spiralnail / Truss Panel wall constructed in 2015.  The project is located in Tacoma, WA, and consists of 3492 SF of Truss panels, 196 Spiralnails, with a max height of 12'.  The N. Vassault Street Sidewalk Improvements wall was constructed by Global Contractors, LLC, designed by Cesaretti Engineered Solutions, and is owned by the City of Tacoma Public Works Dept.

:
Spiralnail
:
Galvanized
:
Government
:
Under 30'
:
Under 5000 SF

The Buriticá, Antioquia, Colombia Mine project was constructed in 2018.  Construction supervision was provided by Tom Meehan, Earthtech West, LTD., and the walls were designed by Tom Jepsen, Jepsen Engineering.

 

Wall Details:

•    Welded Wire Walls – Four locations:  
      Area 6100 WTP, Area 3100 Primary Crusher, Area 6511 Workshop and Area 6950 Loading Station
•    Surcharge Conditions:
•    ULL for crusher 1331 psf, all other areas 500 psf
•    Seismic acceleration of 0.20g
•    50-year design life – Hot Dip Galvanized
•    45,136 TOTAL all 4 areas [18 ea. 40’ OT containers]         
•    Maximum Wall Height of 48’
•    Maximum Mat Length of 34’
 

:
Welded Wire Wall
:
Galvanized
:
Mining
:
Over 30'
:
Over 5000 SF