The South Fork Flathead – Hungry Horse project is a Eureka Reinforced Soil wall and was constructed in 2017. This project is located in Hungry Horse, Flathead County 59919, Montana. The South Fork Flathead- Hungry Horse wall is 6,032 Square feet and 34 feet tall. The wall is owned by Montana Department of Transportation. The wall designer for the project was CESaretti Engineered Solutions and the contractor was Knife River.
:
Eureka Reinforced Soil (E.R.S.) 2-Stage
:
Galvanized
:
Private
:
Over 30'
:
Over 5000 SF
The Vassiliadis Elementary School project is a Eureka Reinforced Soil wall and was constructed in 2016. The Vassiliadis Elementary School wall is located on Antelope Ridge Drive, Las Vegas, Clark County 89138, Nevada. The wall is 26640 square feet and 22 feet tall. Clark County School District is the owner of the wall. CESaretti Engineered Solutions was the wall designer on the project and Pace Contracting was the contractor.
:
Eureka Reinforced Soil (E.R.S.) 2-Stage
:
Non-Galvanzied
:
Government
:
Under 30'
:
Over 5000 SF