The Middleton Wastewater Treatment Facility Improvements project was constructed in 2008 by Circle C Construction. The wall consists of 8000 SF of Welded Wire Wall, and 345 CY of ArtWeld Gabions.  The wall was designed by American Geotechnics (now Shannon and Wilson), and owned by the City of Middleton.

:
ArtWeld Gabions
:
Non-Galvanzied
:
Government
:
Under 30'
:
Over 5000 SF

The Dexter Pit Park Development project (Thomas C. Wales Park) located in Seattle, WA, consists of 230 CY of ArtWeld Gabions as well as quarry rings made from curved ArtWeld Gabions. it was constructed by Retaining Walls Northwest, owned by Seattle Parks and Recreation Dept., and designed by Site Workshop LLC Landscape Architects and Adam Kuby.  

:
ArtWeld Gabions
:
Galvanized
:
Government
:
Under 30'
:
Under 500 CY

The Big I Landscaping Project consists of 1,357 CY of ArtWeld Gabions.  The project is located in Albuquerque, NM, deisgned by Collins Engineers, Inc., constructed by Mountain West Golfscape, Inc., and owned by The City of Albuquerque.

:
ArtWeld Gabions
:
Non-Galvanzied
:
Government
:
Under 30'
:
Over 500 CY

The Pat Hurley Park project consists of 906 CY of ArtWeld Gabions.  The project is located in Albuquerque, NM, was built by TLC Plumbing and Utility, and owned by the City of Albuquerque, Parks and Recreation.

:
ArtWeld Gabions
:
Galvanized
:
Government
:
Under 30'
:
Over 500 CY

The Ruidoso Middle School project consists of 616 CY of ArtWeld Gabions. The wall was constructed by Desert Utility and Paving, LLC, designed by Ontiveros & Associates, Inc., and owned by Ruidoso Municipal School District.

:
ArtWeld Gabions
:
Galvanized
:
Government
:
Under 30'
:
Over 500 CY

The Base to Base Gondola, KT-22 project is a Welded Wire Wall with ArtWeld Gabions on top, constructed in 2022. The Welded Wire Wall is 4,640 SF and 30' tall, it also consists of 330 CY of ArtWeld Gabions.  The wall was built by Sierra Nevada Construction, designed by NV5, and owned by Palisades Tahoe.

:
ArtWeld Gabions
:
Galvanized
:
Private
:
Over 30'
:
Under 5000 SF

The Valais Phase 9 Development project is a gabion wall constructed by Watts Enterprises in 2015.  The wall is 18' tall and consists of 737 cubic yards of ArtWeld Gabions. The wall was designed by IGES, and is privately owned. 

:
ArtWeld Gabions
:
Non-Galvanzied
:
Private
:
Under 30'
:
Under 5000 SF

The City of Puyallup WSU Lid Frontage Improvements project is a Spiralnail Truss wall, and multiple gabion walls. The Spiralnail Truss wall is 3,156 SF of Truss, and 177 Spiralnails.  The gabion walls consist of 830 CY of ArtWeld Gabions.  The walls were constructed in 2021 by Reed Trucking and Excavating, Inc.  The Spiralnail Truss Wall was designed by Cesaretti Engineered Solutions, and all walls are owned by the City of Puyallup.

:
ArtWeld Gabions
:
Galvanized
:
Government
:
Under 30'
:
Under 5000 SF

The Caltrans 01-0F6804 is a ArtWeld Gabion Project for a Caltrans Designed Gabion Face MSE Wall. The wall was built in 2021 by R Brown Construction Co., Inc. and located in Willow Creek, CA. The Caltrans 01-0F6804 wall is 5,346 SF (594 CY of ArtWeld Gabions), and 12' tall.  The wall was designed and is owned by Caltrans.

:
ArtWeld Gabions
:
Galvanized
:
Government
:
Under 30'
:
Over 5000 SF

The Waterfront Park Grant Street Pier project contains Gabion Faced MSE walls as well as ArtWeld Gabions for landscaping.  The primary Gabion Faced MSE wall is 4,126 SF, with a total amount of 5,597 SF (338 cubic yards) of ArtWeld Gabions.  The Wall was built in 2019 by Tapani Underground, Inc., designed by Cesaretti Engineered Solutions, and owned by the City of Vancouver.

:
ArtWeld Gabions
:
Galvanized
:
Government
:
Under 30'
:
Over 5000 SF