• Vernal Crusher Relocation Project

The Vernal Crusher Relocation Project is a welded wire wall constructed in June 2014 located in Vernal, Utah. The wall designer is Glen Palmer, Palmer Engineering, LLC and the wall builder is West Rock Oil Field Services with the on-site technical assistance provided by Talle Meehan, EarthTech West, Ltd.

Wall Details:

•    Welded Wire Wall (double wall)
•    Maximum Wall Height of 30’
•    Maximum Mat Length of 40’
•    Non-Galvanized / Black steel
•    7,456 SF of Welded Wire Wall
 

Wall Type: 
Welded Wire Wall
Wire Type: 
Non-Galvanzied
Owner Type: 
Mining
Wall Height: 
Wall Size: 
Over 5000 SF