• URS Silica Mine Crusher Wall

The URS Silica Mine Crusher Wall project is non-galvanized welded wire wall constructed in October 2015. The project is located Soda Springs, Idaho. The contactor on the project is EarthTech West Ltd and the wall designer is American Geotechnics. 

Wall Details:

•    Welded Wire Wall (one angle point)
•    Maximum Wall Height of 27’
•    Maximum Mat Length of 34’
•    35-year design life – Non-Galvanized steel
•    2,712 SF


 

Wall Type: 
Welded Wire Wall
Wire Type: 
Non-Galvanzied
Owner Type: 
Mining
Wall Height: 
Wall Size: 
Under 5000 SF