San Cristóbal Mine Project

The San Cristóbal Mine Project is a Welded Wire Wall that was constructed in 2006.  The wall construction was supervised by EarthTech West, Ltd.

Wall Details:

•    Primary Crusher Design Loading: CAT 785C, confined to a concrete apron.  
•    20-year design life, Based on normal corrosion criteria, (TxWW Hot Dip Galvanized)
•    Primary Crusher Maximum Wall Height is 82' [25 m]
•    Longest Mat is 58’ [18 m]; [spliced mats used to achieve required embedment]
•    Seismic Acceleration Coefficient of 0.15g  
•    2,440 SM  
 

Wall Type:
Welded Wire Wall
Wire Type:
Galvanized
Owner Type:
Mining
Wall Height:
Over 30'
Wall Size:
Over 5000 SF