ERFO 2012(4), Power Ranger District, is an ArtWeld Gabion wall constructed in 2014. The wall has a max height of 18', consists of 314 CY of ArtWeld Gabions, and is located at the Rogue River-Siskiyou National Forest. The wall was built by Johnson Rock Products, owned by the USDA Forest Service, Pacific Northwest Region, and designed by the USDA Forest Service, Pacific Northwest Region as well.
The Jeff Mack Bridge project is a Welded Wire Wall bridge Abutment constructed in 2017. The Jeff Mack Bridge project is 576 SF, 8 feet tall, and located in Millville, CA. The wall was constructed by JH Mack Construction, it was designed by Cesaretti Engineered Solutions, and is privately owned.
The SH 16 Over Phyllis Canal & Joplin Rd project is a ERS wall constructed in 2013. This ERS wall is 14,800 SF, 39' tall, and is located in Meridian, ID. The wall was constructed by Concrete Placing Company, it was designed by SHN Consulting Engineers & Geologists, and is owned by the Idaho Transportation Department.
The De Pere - Suamico, Memorial Dr-CTH M B5/129, Call #12 project is a ERS wall constructed in 2013. This ERS wall is 5,654 SF, 28' tall, and is located in Howard, WI. The wall was constructed by Vinton Construction Company, the panels were manufactured and set by Lunda Construction Company, and the wall is owned by WisDOT.
De Pere - Suamico, Morris Ave-Memorial Dr, Call# 16 project is a ERS wall constructed in 2012. This ERS wall is 32,792 SF, 20' tall, and is located in Howard, WI. The wall was constructed by Highway Landscapers, Inc., the panels were manufactured and set by Lunda Construction Company, and the wall is owned by WisDOT.
The De Pere - Suamico, Morris Ave-Memorial Dr., Call# 21 project is a ERS wall constructed in 2012-2014. This ERS wall is 164,216 SF, 38' tall, and is located in Howard, WI. The wall was constructed by Hoffman Construction Company, the panels were manufactured and set by Lunda Construction Company, and the wall is owned by WisDOT.
Click below for additional phases of this project:
The Rush Road to 13th Street project is a ERS wall constructed in 2008. The wall is 28' tall, 27,600 SF, and located in Chehalis, Washington. The Rush Road to 13th Street wall was built by Scarsella Bros. Inc., designed by SHN Consulting Engineers and Geologists, and owned by WSDOT.
The Center Street Bridge Project is a Welded Wire Wall constructed in 2008. The wall is 20' tall, 10,300 SF, and located in Clearfield Utah. The Center Street Bridge was constructed by Baker Construction, and owned by the City of Clearfield.
The UW Montlake Triangle & Lower Rainier Vista project is a Gabion-Faced MSE wall constructed in 2015. The wall is 22' at the tallest point, 3800 SF and located in Seattle, Washington. The UW Montlake Triangle & Lower Rainier Vista project was constructed by KLB Construction Inc., Designed by Cesaretti Engineered Solutions, and owned by the University of Washington
The CA ERFO Angeles NF 3N17(2) Santa Clara Divide project is a Welded Wire Wall Constructed in 2019/2020. This Welded Wire Wall is 38' tall, 5100 SF, and is located along the Santa Clara Divide Rd, Sylmar, CA 91342. The wall was constructed by Cutting Edge Constructors & Engineers, designed by Cesaretti Engineered Solutions, and is owned by Federal Highway, Central Federal Lands.
Before Photo