• Bear Run Mining Project

The Bear Run Mining Project is a hot dipped galvanized welded wire wall mining project constructed in September 2009. The project is located Dugger, Indiana. The wall builder was Baker Construction and the wall designer was Geotechnical Design Systems Inc.

Wall Details:

•    Welded Wire Wall
•    Maximum Wall Height of 46’
•    Maximum Mat Length of 30’
•    Loads: CAT 789 End Dumps
•    Nominal pseudo-static seismic coefficient of 0.10g
•    30-year design life – Hot Dip Galvanized [based on ACCELERATED corrosion rate]
•     9,680 SF (899 SM)
 

Wall Type: 
Welded Wire Wall
Wire Type: 
Galvanized
Owner Type: 
Mining
Wall Height: 
Wall Size: 
Over 5000 SF