The Marble Quarry Jaw Crusher Wall Project is a Welded Wire Wall constructed in August 2010. The project is located in Columbia, California. The builder of the wall was Blue Mountain Minerals.
Wall Details:
• Welded Wire Wall, black (non-galvanized)
• 20-year design life
• Maximum Wall Height of 32’
• Maximum Mat Length of 25’
• 4336 SF
Wall Type:
Welded Wire Wall
Wire Type:
Non-Galvanzied
Owner Type:
Mining
Wall Height:
Wall Size:
Under 5000 SF