The Sorting Facility Ramp project is a mining project constructed in June 2018. The project is located in Montana. The maximum wall height is 28 feet and 8,440 square feet. The designer of the wall was CESaretti Engineered Solutions.
Wall Type:
Welded Wire Wall
Wire Type:
Galvanized
Owner Type:
Mining
Wall Height:
Wall Size:
Over 5000 SF