The Nye, Montana Mining Project was constructed in September 2018. The project is located in Nye, Montana. The wall designer was CESaretti Engineered Solutions.
WALL DETAILS:
• Welded Wire Wall (one angle point)
• Maximum Wall Height of 18’
• Maximum Mat Length of 14’
• Loads: Factor bearing load – 3,500 psf.
• Maximum ground acceleration coefficient, A=0.150
• 75-year design life – Black Steel
• 2,592 SF (57 AWG)
Wall Type:
Welded Wire Wall
Wire Type:
Galvanized
Owner Type:
Mining
Wall Height:
Wall Size:
Under 5000 SF